My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-46 AUTHORIZING EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-46 AUTHORIZING EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 4:28:17 PM
Creation date
1/19/2016 4:28:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-46
Res Ord Title
AUTHORIZING EXECUTION OF AN AGREEMENT BLACK & VEATCH CORPORATION ENGINEERING CONSULTATION SERVICES LAKE DECATUR WATER QUALITY PROTECTION MEASURES
Approved Date
4/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> TO <br /> DESIGN PROFESSIONAL SERVICES AGREEMENT <br /> Owner: City of Decatur, Illinois <br /> Design Professional: Black&Veatch Corporation <br /> Project: Lake Decatur Water Quality Protection Measures <br /> Date: , 2002 <br /> SCOPE OF SERVICES ' <br /> The Scope of Services for the project shall generally consist of project development, construction �, <br /> permit applications, environmental assessment,preliminary and detailed design,preparation of � <br /> construction documents, permits and approvals, bidding assistance, construction control <br /> administration and resident project representative for the construction of Lake Decatur Water <br /> Quality Protection Measures. <br /> BASIC SERVICES <br /> The City has identified three Project Development tasks associated with the Water Quality <br /> Protection Measures described in the Request for Qualifications and Proposals, Lake Decatur <br /> Water Quality Protection Measures, Engineering Services, dated September 11, 2001. <br /> 1. Raw Water Emergency Intake Lines for the South Water Treatment Plant Intake. <br /> 2. Flow Control for the A.E. Staley "Hot Water Ditch" Outfall to Lake Decatur. <br /> 3. Raw Water Intake Relocation for the South Water Treatment Plant. <br /> Task 1. Project Development <br /> 1. A.E. Staley"Hot Water Ditch" Outfall Control Structure. Task 1.1 involves the planning <br /> for the construction of a method for isolating the contents of the ditch from the Lake <br /> Decatur in the event of a hazardous materials or hydrocarbons spills in the watershed. Up <br /> to three sites will be considered. The work associated with this task will generally consist <br /> of the following: <br /> a. Walk the ditch between the discharge point at the railroad yard and Lake Decatur and <br /> identify potential sites for control structure(s). <br /> b. Review City's storm water management program to determine if this project will be <br /> influenced by any future storm water management projects. <br /> c. Prepare contour map at each identified site and identify property owners around the <br /> perimeter of each site. <br /> A-1 <br /> ComAttachA I,ake Decatur <br /> slwDecatur Disk/as <br /> 03/OS/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.