My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-46 AUTHORIZING EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-46 AUTHORIZING EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 4:28:17 PM
Creation date
1/19/2016 4:28:15 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-46
Res Ord Title
AUTHORIZING EXECUTION OF AN AGREEMENT BLACK & VEATCH CORPORATION ENGINEERING CONSULTATION SERVICES LAKE DECATUR WATER QUALITY PROTECTION MEASURES
Approved Date
4/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , . <br /> b. Identify potential sites along the banks of Lake Decatur that are upstream of the US <br /> Route 51 bridges. <br /> c. Identify and evaluate sites for new raw water intake based on operation and <br /> maintenance criteria defined by the City. <br /> d. Determine the availability of electrical power to intake sites. <br /> e. Determine the impact on high lake levels at intake sites. <br /> f. Identify construction permitting requirements. This includes City, IEPA and U.S. <br /> Army Corps of Engineers. <br /> g. Prepare technical memorandum including opinion of probable construction cost for <br /> review and comment by the City. The contents of this memorandum will be included <br /> in the final report. <br /> 4. Report and Workshop. Task 1.4 involves a final project workshop and the preparation of <br /> a report that defines its basis of design and provides an opinion of probable construction <br /> costs. <br /> a. Pre are draft r <br /> e ort based on contents of the final technical memorandums and <br /> P P � <br />' comments, for review and comment by the City. Provide 6 copies. <br /> b. Conduct workshops with City representatives to discuss the contents of the draft <br /> report. <br /> c. Prepare and submit final report. Provide 20 copies. <br /> ADDITIONAL BASIC SERVICES <br /> Task 1. Construction Permit Applications <br /> l. Prepare environmental assessment. <br /> 2. Prepare and submit joint(COE, IEPA, and IDNR/DWR) application for construction <br /> permit. <br /> 3. Prepare and submit applications for NPDES storm water permit. <br /> 4. Prepare and submit permit application to IEPA Public Water Supply Permit Program. <br /> 5. Prepare and submit information to Illinois State Historical Preservation Agency. <br /> Task 2. Design and Construction Contract Documents <br /> 1. Provide,through a subcontract,the necessary field surveys for the preparation of <br /> construction drawings and specifications. Surveys will determine site topography, <br /> contours, and insofar as possible, utility locations. <br /> 2. Provide, through a subcontract, the easement descriptions needed by the City for the <br /> construction and maintenance of the project. <br /> A-3 <br /> ComAttachA Lake Decatur <br /> slwDeca[ur Disk/as <br /> 03/OS/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.