My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-165 AUTHORIZING THE EXECUTION OF A DESIGN PROFESSIONAL SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-165 AUTHORIZING THE EXECUTION OF A DESIGN PROFESSIONAL SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 2:34:30 PM
Creation date
1/21/2016 2:34:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-165
Res Ord Title
AUTHORIZING THE EXECUTION OF A DESIGN PROFESSIONAL SERVICES AGREEMENT SWTP OFFICE AND LABORATORY ADDITION
Approved Date
9/4/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> TO <br /> DESIGN PROFESSIONAL SERVICES AGREEMENT <br /> Owner: City of Decatur, Illinois II <br /> Design Professional: Black & Veatch Corporation i <br /> Project: Waterworks Improvements ' <br /> South Water Treatment Plant ' <br /> Office and Laboratory Addition ', <br /> Date: , 2001 �! <br /> SCOPE OF SERVICES III <br /> The Scope of Services for this project shall generally consist of performing engineering design ' <br /> and pre-award services for a 3,500 square foot addition to the office area of the South Water ', <br /> Treatment Plant and creation of a 500 square foot laboratory in existing office space. These <br /> preliminary layouts are shown in Plan B, previously submitted to the Owner along with building , <br /> elevations. The building additions will include the design of a new parking lot containing 27 ', <br /> spaces to replace the existing parking lot. i <br /> BASIC SERVICES <br /> Task 1. Project Development <br /> A. Project Administration and Meetings. <br /> 1. Meet with Owner to update the parameters of the Project. ' <br /> 2. Obtain and review Owner-furnished front-end documents, meet with Owner to <br /> resolve review comments, and revise Design Professional's standard documents <br /> accordingly. <br /> 3. Determine what local building/electrical /fire codes and other design criteria <br /> such as OSHA,ADA, and IEPA design guides, will influence the design of this <br /> facility. <br /> 4. Arrange for and participate in informal meetings with Owner during the design <br /> phase to review progress and exchange ideas and information at 60 percent and 90 <br /> percent project completion stage. A total of three (3) meetings are anticipated. <br /> A-1 <br /> CA�IDAllachA <br /> slwlas <br /> 8/ISftll <br />
The URL can be used to link to this page
Your browser does not support the video tag.