Laserfiche WebLink
B. Design Memorandum <br /> 1. Prepare a detailed design memorandum, preliminary drawings and preliminary <br /> opinions of probable construction cost, as required to establish agreement on <br /> scope, parameters, layout requirements, and project approach. Submit five copies <br /> to Owner for review and comment. <br /> 2. Meet with Owner and obtain Owner's comments on the design memorandum and <br /> preliminary drawings. Resolve any questions, revise documents if necessary, and <br /> resubmit five copies to Owner. <br /> Task 2. Surveying Services <br /> A. Design Surveys <br /> 1. Provide, through a subcontract, the necessary field surveys for the preparation of <br /> construction drawings and specifications. Surveys will determine site <br /> topography, contours, and insofar as possible, utility locations. <br /> Task 3. Design and Construction Contract Documents <br /> 1. Prepare detailed drawings and specifications and other contract documents for the <br /> proposed construction work and for the materials and equipment required. <br /> The construction documents shall be prepared for selection of private construction <br /> contractors on a competitive bid basis. <br /> 2. Prepare one contract for performance of all construction work, including site <br /> work. <br /> 3. Prepare an opinion of probable construction cost for the proposed work covered <br /> by the contract documents. Updated versions of the opinion of probable <br /> construction cost shall be presented for review at 60 percent and 90 percent <br /> project completion stage and after the contract documents are completed. <br /> 4. Review contract documents for completeness, bidability, and constructability. <br /> 5. Provide three sets of(work in progress) drawings and specifications to Owner for <br /> review at 60 percent and 90 percent project completion for review and comment. <br /> Meet with Owner to review comments and resolve questions. <br /> 6. Provide three sets of final drawings and specifications to Owner for review and <br /> comment including building codes review. Meet with Owner to review comments <br /> and resolve questions. If required, revise final drawings. Provide two sets to <br /> Owner for record. <br /> A-2 <br /> Co1DAuachA <br /> shvlas <br /> 8/IS/(Il <br />