My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-140 AUTHORIZING THE FILING OF AN APPLICATION
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-140 AUTHORIZING THE FILING OF AN APPLICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 3:47:35 PM
Creation date
1/21/2016 3:47:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-140
Res Ord Title
AUTHORIZING THE FILING OF AN APPLICATION FOR A CAPITAL ASSISTANCE GRANT - ILLINOIS DEPARTMENT OF TRANSPORTATION
Approved Date
7/30/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR, ILLINOIS <br /> PROJECT DESCRIPTION AND NSTIFICATION, continued <br /> 11.43A2 Construct Maintenance Facility($ 15,000): Construct fueling station canopy. <br /> Transit proposes to construct a 40' long canopy over the fueling station. The <br /> canopy would extend part way over the bus lane, with a solid wind-break wall on <br /> the western side. The canopy would protect the workers fueling buses at night, <br /> particularly during the harsh winter weather. The canopy would also reduce the <br /> risk of water or wind-blown debris contaminating the fuel tanks of the buses. <br /> 11.44.02 Rehab/Renovate Maintenance Facility($ 25,000): Repair/upgrade bus washer. <br /> The bus washer is about 5 years old and needs to be repaired and upgraded. First, <br /> all of the rotating brushes show significant wear and some are missing sections. <br /> Second, the large water valves need to be replaced with anti-hammer valves to <br /> eliminate the severe hammerin�/vibration that occurs when the valves close <br /> suddenly. If this condition is not corrected, the 4"water main which runs along <br /> the wall over the maintenance area could rupture. Upgrades to the bus washer <br /> (adding a wheel washer unit and an underbody washer, with a supplemental <br /> pump) would improve the appearance of the buses and reduce underbody <br />' corrosion and maintenance expense. <br />; 11.44.03 Rehab/Renovate Admin/Maint Facility($ 3,257): Sidewalk replacement. <br /> An examination of the Transit Administration Building resulted in the <br /> recommendation that the plantings around the front of the building be removed <br /> and replaced with concrete, sloped away from the building, in order to reduce <br /> moisture at the base of the building walls. Failure to correct this problem could <br /> lead to deterioration of tile waiis and signincant cosis to repair and replace the <br />� damage. <br /> 11.62.02 Purchase Communications System($ 38,000): Purchase new radio system. <br /> Transit proposes to purchase and install a 800 Mhz trunked radio system linked to <br /> City's E911 dispatch system. The new radio system would include mobile radios <br /> with handsets for each revenue vehicle and each service truck,portable radios for <br /> each supervisor's vehicle, and 3 control stations. This would allow the en�ire <br /> fleet of vehicles to communicate with each other,with the dispatchers, and with <br /> e er enc services. New buses built this ear will alread have the new radios <br /> m g Y Y Y <br /> installed; only the service vehicles, ADA vans, and the buses which are not <br /> scheduled to be replaced will need to be upgraded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.