Laserfiche WebLink
i • �, <br /> � � , , �� <br /> HUBBARD AVENUE/ REA'S BRIDGE CONNECTOR <br /> PHASE II ENGINEERING SERVICE AGREEMENT <br /> THIS AGREEMENT, made and entered into th�l�day of e, A.D. 2 01, by and <br /> befinreen the CITY OF DECATUR, ILLINOIS, hereinafter referred to s the �CI d BLANK, <br /> WESSELINK, COOK&ASSOCIATES, INC., hereinafter referred t as the"ENGINEER", covers <br /> professional engineering services in connection with the Hubbard Avenue / Rea's Bridge Road <br /> Connector. <br /> WITNESSETH THAT, in consideration of these premises and of the mutual covenants <br /> herein set forth, '� <br /> The ENGINEER AGREES, <br /> 1. Engineerinq Services—To perform or be responsible for the performance of the professional <br /> engineering services for the CITY as described by Enclosure (1), Project Plan, dated June , <br /> 13, 2001. <br /> 2. That all reports, studies, tracings, plans, aerial survey plans, reconnaissance data, cost <br /> estimates, maps, contract documents, including right-of-way and easement documents, to <br /> be fumished by the ENGINEER in accordance with Enclosure (1) to Section 1 of THE <br /> ENGINEER AGREES shall be in accordance with the current standard specifications and !� <br /> policies of the CITY, it being understood that all such reports, studies, tracings, plans, aerial I <br /> survey plans, reconnaissance data, cost estimates, maps, contract documents, including I <br /> right-of-way and easement documents shall, before being finally accepted, by subject to ' <br /> approval by the CITY. During the performance of the engineering services herein provided I <br /> for, the ENGINEER shall be responsible for any loss or damage to the documents herein �I <br /> enumerated while they are in the ENGINEER's possession and any such loss or damage <br /> shall be restored at the ENGINEER's expense. <br /> 3. To attend conferences to be held at the request of the CITY and visit the site of the work at �, <br /> any reasonable time when requested to do so by the CITY. �, <br /> 4. That reports, studies, tracings, plans, aerial survey plans, reconnaissance data, cost <br /> estimates, maps, contract documents, including right-of-way and easement documents, and <br /> other documents prepared by the ENGINEER in accordance with the AGREEMENT shall be <br /> delivered to and become tfie property of the CITY and that basic survey notes, sketches, <br /> charts, and other data prepared or obtained in accordance with the AGREEMENT shall be <br /> made available, upon request, to the CITY, without restriction or limitation as to their use. ' <br /> 5. That should the CITY require changes to the contract documents after they have been II <br /> completed in accordance with the contract or as a result of policy changes by the CITY �I <br /> during the time work is underway the CITY shall pay the ENGINEEER for such extra work in I� <br /> accordance with Section 2 of THE CITY AGREES. ', <br /> It is understood that "changes" as used in this section means basic changes in location or �', <br /> design and that the provisions of this section shall in no way relieve the ENGINEER of his 'I <br /> responsibility to prepare a complete and adequate set of documents satisfactory to the <br /> CITY. � <br /> - 1 - <br />