Laserfiche WebLink
' � Enclosure (1) i <br /> June 13, 2001 I <br /> Page 1 of 6 �' <br /> PROJECT PLAN ' <br /> CITY OF DECATUR ''� <br /> HUBBARD AVENUE/ REA'S BRIDGE ROAD CONNECTION <br /> PHASE II I <br /> 1. ADMINISTRATION & MANAGEMENT , <br /> a. BWC Team Meetings ' <br /> b. Prepare invoicing I, <br /> c. Attend Meetings and Field Checks � <br /> d. Prepare Meeting Minutes '� <br /> 2. PRELIMINARY PtANS <br /> 2.1 Cover Sheet <br /> a. Mark-Up Cover Sheet <br /> b. Prepare Index of Sheets <br /> c. Draft <br /> d. Check & Correct <br /> 2.2 Alignment &Ties Drawings <br /> a. Draft Alignment <br /> b. Draft Control Ties <br /> c. List Bench Marks <br /> d. Check & Correct <br /> 2.3 General Notes & Standards <br /> a. Mark-Up General Note Plan <br /> b. Review IDOT Standard Requirements <br /> c. Draft General Notes and Standard Sheets <br /> d. Check & Correct <br /> 2.4 Typical Sections <br /> a. Mark-Up Preliminary Sections <br /> b. Draft Sections <br /> c. Check & Correct <br />