My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-126 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-126 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 4:27:15 PM
Creation date
1/21/2016 4:27:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-126
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH BLANK, WESSELINK, COOK & ASSOCIATES, INC., FOR FINAL DESIGN SERVICES FOR HUBBARD AVENUE / REA'S BRIDGE ROAD CONNECTOR
Approved Date
7/2/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��• . � � Enclosure (1) <br /> June 13, 2001 <br /> Page 2 of 6 <br /> 2.5 Summary of Quantities <br /> a. Develop Pay Item List <br /> b. Select Construction Codes <br /> c. Draft Summary Sheet <br /> d. Check and Correct <br /> 2.6 Schedule of Quantities <br /> a. Prepare Preliminary Schedule of Quantities Sheet <br /> 2.7 Plan & Profile Sheets <br /> a. Plot Proposed Improvements <br /> b. Adjust Preliminary Grades <br /> c. Mark-Up Plan Notes <br /> d. Sketch Erosion Control Measures <br /> e. Draft Preliminary Plans <br /> f. Check & Correct <br /> 2.8 Drainage & Utility Plans <br /> a. Review lnlet Spacing <br /> b. Adjust Manholes & Inlets <br /> c. Review Flowline &Top of Casting Elevations <br /> d. Sketch Water Main Location <br /> e. Apply Cross Utilities in Profile <br /> f. Draft Drainage & Utility Plans <br /> 2.9 Geometric Plans <br /> (Route 48) (27th St.) (Brush College) <br /> a. Review Geometrics <br /> b. Establish Elevations <br /> c. Establish Joint Spacing <br /> d. Draft Geometric Plans <br /> e. Check & Correct <br /> 2.10 Signalization Plans <br /> (Route 48) (27th St.) (Brush College) <br /> a. Prepare Signal Plan <br /> b. Prepare Signal Wiring and Detector Loop Plan <br /> c. Prepare Schedule Sheets <br /> d. Draft Signal, Wiring and Schedule Plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.