Laserfiche WebLink
� - <br /> . SKS ENGINEERS, INC. <br /> CONSULTING ENGINEERS <br /> DECATUR, ILLINOIS <br /> • JUNE,2000 <br /> (FEE SCHEDULE CONTINUED) <br /> SOIL TEST BORINGS <br /> Unit Price Rates for Drilling <br /> and Split-Barrel Sampling at <br /> 2'/z to 5-ft intervals <br /> 0 to 30 ft 30 to 60 ft <br /> N-count less than <br /> 60 blows per foot 10.75 13.00 <br /> N-count greater than <br /> 60 blows per foot 13.00 15.25 <br /> Securing Thin-Wall Tube Samples $50.00/Each <br /> Mobilization of Drill Rigs with <br /> 2-man crews to and from site $165.00 minimum or as quoted for specific projects <br /> Hourly Rates for Different Type of Work <br /> Drilling and Sampling $135.00/Hour <br /> Winching and Towing $135.00/Hour <br /> Monitor Well Installation/Development $135.00/Hour <br /> Standby Time at Clients Direction $135.00/Hour <br /> Two-Man drill crew and service truck <br /> required for work other than drilling/ <br /> samplinglwell installation $110.00/Hour <br /> Extras <br /> Incidental materials, supplies and otherjob-related expenses as required to pertorm the work have not been <br /> included in the mobilization costs and will be charged at cost plus 15 percent. All subcontract work(towing, <br /> clearing, etc.)will also be charged at cost plus 15 percent. <br /> EQUIPMENT <br /> Car or Pickup $0.35/Mi. Survey Truck $7.25/Hr. <br /> Inspection Truck $7.25/Hr. Coring Machine w/Crew&Truck $ 95.00/Hr. <br /> Concrete Cylinder Molds $ 1.50/Ea. Per Diem &Expenses Cost+ 15% <br /> NOTES <br /> All work will be billed portal to portal. All travel outside Decatur at 0.35/Mile. Overtime work at the ClienYs request will <br /> be at 1.3 times the above rates. All sub-consultant work will be charged at cost plus 15%. <br /> The fees listed hereon assume monthly billings and prompt payment. All unpaid balances over 30 days old will be <br /> subject to 1'r4°r6 per month(18%annual rate)carrying charge. <br /> Revised 6/00 <br /> Page 2 of 2 <br />