My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-72 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 2:04:07 PM
Creation date
1/22/2016 2:04:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-72
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET MILLING AND REHABILITATION PROGRAM
Approved Date
4/16/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2001 - 17 <br /> April 10, 2001 <br /> TO: Honorable Mayor and City Council <br /> FROM: Steve Garman., City Manager r+ <br /> Stephen P. Swanson,P. E.,Director of E &�I�./ � <br /> Matthew C. Newell, P. E., City Engineerh�" <br /> William A. Ratekin,Assistant City Engineer �j(1 �/ <br /> SUBJECT: Milling And Rehabilitation <br /> City Project 2001-08 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for the 2001 Milling and Rehabilitation project, City Project No. 2001-08, to Dunn <br /> Company as the lowest responsive, responsible bidder in the amount of$2,404,355.90 and that <br /> the Mayor be authorized to execute the contract. <br /> BACKGROUND: <br /> The Engineering Division has developed a project for this year's annual Milling and <br /> Rehabilitation Program. The milling and rehabilitation involves removing one to two inches of <br /> the existing street surface by milling and then placing a new hot bituminous concrete surface I, <br /> over the milled area. This project will also perform joint repair on several concrete streets. The �, <br /> purpose of this program is to restore the useful life to a pavement in advance of its deteriorating '�, <br /> to a condition that would require its complete reconstruction. An additional benefit of the I <br /> program is that the rideability of the street is improved for users. This year's program will � <br /> in miles of streets throu out the Cit . A listin of the ' <br /> include approximately 16.1 centerl e gh y g <br /> streets in this year's program is attached. , <br /> The City's Engineering Division prepared the specifications for this project. The project was <br /> advertised for competitive bids and three bids were received and opened on Monday, Apri19, ' <br /> 2001. The results (copy of the bid tabulation is attached) of the letting are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.