My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2001-61 AUTHORIZING NEGOTIATION OF A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2001
>
R2001-61 AUTHORIZING NEGOTIATION OF A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 2:29:57 PM
Creation date
1/22/2016 2:29:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2001-61
Res Ord Title
AUTHORIZING NEGOTIATION OF A CONTRACT FOR OWNER'S REPRESENTATIVE - THE MULTI-MODAL TRANSPORTATION FACILITY
Approved Date
4/2/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manager shall show actual costs for activities in progress and <br /> 2.3.2 The Construction Manager shall provide estimates for uncompleted tasks by way of comparison with <br /> administration of the Contracts for Construction in such approved estimate. <br /> ' cooperation with the Architect as set forth below and in the <br /> edition of AIA Document A201/CMa,Generai Conditions of 2.3.9 The Construction Manager shall develop cash flow <br /> the Contract for Construction, Construction reports and forecasts for the Project and advise the Owner <br /> Manager-Adviser Edition, current as of the date of this and Architect as to variances between actual and budgeted or <br /> . Agreement. estimated costs. <br /> 2.3.3 The Construction Manager shall provide 2.3.10 The Construction Manager shall maintain I, <br /> administrative, manageme�t and related services to accounting records on authorized Work periormed under i <br /> coordinate scheduled activities and responsibilities of the unit costs, additional Work performed on the basis of actual <br /> Contractors with each other and with those of the costs of labor and materials, and other Work requiring <br /> Construction Manager, the Owner and tlze Architect to accounting records. <br /> endeavor to manage the Project in accordance with the latest <br /> approved estimate of Construction Cost,the Project Schedule 2.3.11 The Construction Manager shall develop and <br /> and the Contract Documents. implement procedures for the review and processing of <br /> applications by Contractors for progress and final payments. <br /> 2.3.4 The Construction Manager shall schedule and <br /> conduct meetings to discuss such matters as procedures, 2.3.11.1 Based on the Construction Manager's observations <br /> progress and scheduling. The Construction Manager shalt and evaluations of each Contractor's Application for <br /> prepare and prornptly distribute minutes to the Owner, Payment, the Construction Manager shall review and certify <br /> Architect and Contractors. the amounts due the respective Contractors. <br /> 2.3.5 Utilizing the Construction Schedules provided by 2-3.11.2 The Construcrion Manager shall prepare a Project <br /> � S'Clnll ll �'ic i,ic' arr�'-�tinn f[ir P��ent b8SCC1 Ori the Contractors' <br /> C ntractors tne i;onsixuciion iviana e <br /> the o , S P� <br /> � Project construction schedule incorporating the activities of Certificates for Payment. <br /> the Contractors on the Project, including activity sequences <br /> and durations, allocation of labor and materials, processing 2•3.11.3 T'he Construction Manager's certification for <br /> • of Shop Drawings, Product Data and Samples, and delivery payment shall constitute a representation to the Ov►mer,based <br /> of products requiring long lead tim� and procurement. The on the Construction Manager's determinations at the site as <br /> Project construction schedule shall include the Ovmer's provided in Subparagraph 2.3.I3 and on the data comprising <br /> occupancy requirements showing portions of the Project the Contractors'Applications for Payment,that,to the best of <br /> having occupancy priority. The Construction Manager shall the Construction Manager's knowledge, information and <br /> updaxe and reissue the Project construction schedule as belie� the Work has progressed to the point indicated and <br /> required to show current conditions. If an update indicates ine quaiiiry oF tri�e N✓vYK 1S li1 a�c�i��z'��� w�t i u�� �:,r�ua�. <br /> that the previously approved Project construction schedule Documents. The foregoing representations are subject to an <br /> may not be met,the Construction Manager shall recommend evaluation of the Work for conformance with the Contract <br /> corrective action to the Owner and Architect. Documents upon Substantial Complerion, to results of <br /> subsequent tests and inspections, to minor deviations from <br /> 2.3.6 Consistent with the various bidding documents, and the Contract Documents correctable prior to completion and <br /> utilizing information from the Contractors,the Construction to specific qualifications expressed by the Construction <br /> Manager shall coordinate the sequence of co�struction and Manager. The issuance of a Certificate for Payment shall <br /> assignment of space in areas where the Contractors are �er constitute a representation that the Contractor is <br /> performing Work. entitled to payment in the amount certified. <br /> 2.3.7 The Construct�on Manager shall endeavor to obtain 2.3.11.4 The issuance of a Certificate for Paynnent shall <br /> satisfactory performance from each of the Contractors. The not be a representation that the Construction Manager has <br /> Construction Manager shall recommend courses of action to (1) made exhaustive or continuous on-site inspections to <br /> the Owner when requirements of a Contract are not being check the quality or quantity of the Work, (2) reviewed <br /> fu:ulled. construction means, methods, techniques, sequences for the <br /> Contractor's own Work,or procedures,(3)reviewed copies of <br /> 2.3.8 The Construction Manager shall monitor the requisitions received from Subcontractors and material <br /> approved estimate of Construction Cost. The Construction suppliers and other data requested by the Owner to <br /> " AIA DOCUMENT B801/CMa - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 EDITION - AIA - COPXRIGHT 1992 - THE AMERICAN <br /> INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.,20006-5292.Unlicensed photocopying violates U.S.copyright laws and is <br /> subject to legal prosecuNon.This document was electronically produced with peimmission of the AIA and can be reproduced without violation unti!the date of expirarion as <br /> noted below. <br /> Electronic Format B801/CMa-1992 <br /> User pocument: 6801 --4/9/2001. AIA License Number 120057, which expires on 10/31/2001 — Page#4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.