substantiate the Contractor's right to payment or (4) I <br /> ascertained how or for what purpose the Contractor has used 2.3.17 The Construction Manager shall review requests for <br /> money previously paid on account of the�ontract Sum. changes, assist in negotiating Contractors' proposals, submit <br /> recommendations to the Architect and Owner, and, if they <br /> , 2.3.12 The Construction Manager shall review the safety are accepted, prepare Change Orders and Construction ' <br /> programs developed by each of the Contractors for purposes Change Directives which incorporate the Architect's <br /> ' of coordinating the safety programs with those of the other modifications to the Documents. <br /> . Contractors. The Construction Manager's responsibilities far <br /> coordination of safety programs shall not extend to direct 2.3.18 The Construction Ma.nager shall assist the Architect <br /> control over or charge of the acts or omissions of the in the review,evaluation and documentation of Claims. <br /> Contractors, Subcontractors, agents or employees of the <br /> Contractors or Subcontractors, or any other persons 2.3.19, The Construction Manager shall receive certificates <br /> performing portions of the Work and not directly employed of insurance from the Contractors and forward them to the <br /> by the Construction Manager. Owner with a copy to the Architect. <br /> 2.3.13 The Const�uction Manager shall determine in 2.3.20 In collaboration with the Architect,the Construction <br /> general that the Work of each Contractor is being performed Manager shall establish and implement procedures for <br /> in accordance with the requirements of the Contract expediting the processing and approval of Shop Drawings, <br /> Documents, endeavoring to guard the Owner against defects �'�u� ��, Samples and other submittals. The <br /> and deficiencies in the Work. As appropriate, the Construction Manager shall review all Shop Drawings, <br /> I Construction Manager shall have authority, upon vvritten <br /> Product Data, Samples <br /> and other submittals from the <br /> ' n Mana er shall coordinate <br /> authorization from the Owner to r uire additional Contractors. The Construcho g <br /> , �1 <br /> inspection or testing of the Work in accordance with the submittals with information contained in related documents <br /> provisions of the Contract Documents, whether or not such and transmit to the Architect those which have been <br /> Work is fabricated, installed or completed. The Conshvction approved by the Construction Manager. The Construction <br /> Manager, iri consuitarion wiin ine tucniie�i, may rejv�;t �`'��'��b�-'S =�=�^� s�'?�l tVw rak�r, w;rh such reasc�n.�ble <br /> � Work which does not conform to the requirements of the promptness as to cause no delay in the Work or in the <br /> Contract Documents. activities of the Owner or Contractors. <br /> 2.3.14 The Construction Manager shall schedule and 2.3.21 The Construction Manager shall record the progress <br /> coordinate the sequence of construction in accordance with of the Project. The Construction Manager shall submit <br /> the Contract Documents and the Iatest approved Project written progress reports to the Owner and Architect <br /> construction schedule. including information on each Contractor and each <br /> Contractor's Work, as well as the entire Project, showing <br /> 2.3.15 With respect to each Contractor's own Work, the percentages of completion. The Construction Manager shall <br /> t t "'__`L_� L <br /> Construction Manager shall not have control over or charge iceep a daiiy Iog containing a rec�ra o� wrK►u�c,, �c,� <br /> of and shall not be responsible for construction means, Contractor's Work on the site, number of workers, <br /> methods, techniques, sequences or procedures, or for safety identification of equipment, Work accomplished, problems <br /> precautions and programs in connection with the Work of encountered; and other similar relevant data as the Owner <br /> each of the Contractors, since these are solely the may require. <br /> Contractor's responsibility under the Contract for <br /> Construction. The Construction Manager shall not be 2•3.22 The Construction Manager shall maintain at the <br /> responsible for a Contractor's failure to carry out the Work in Project site for the Owner one record copy of all Contracts, <br /> accordance with the respective Contract Documents. The Drawings, Specifications,addenda, Change Qrders and other <br /> Construction Manager shall not have control over or charge Modifications, in good order and marked currently to record <br /> of acts or omissions of the Contractors, Subcontractors, or changes and selections made during construction, and in <br /> their agents or employees, or any other persons performing addition, approved Shop Drawings, Product Data, Samples <br /> portions of the Work not directly employed by the and similaz required submittals. The Construction Manager <br /> Construction Manager. shall maintain records, in duplicate, of principal building <br /> layout lines, elevations of the bottom of footings, floor levels <br /> 2.3.16 Th� Ccr.structicn Manager shall transmit to the and key site elevations certified by a qualified surveyor or <br /> ArchiEect requests for interpretations of the meaning and professional engineer. The Construction Manager shall make <br /> intent of the Drawings and Specifications, and assist in the all such records available to the Architect and upon <br /> resolution of questions that may azise. completion of the Project shall deliver them to the Owner. <br /> ' AIA DOCLIMENT B801/CMa - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 BDITION - AIA - COPYRIGHT 1992 - THE AMERICAN <br /> INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.,20006-5292.Unlicensed photocopying violates U.S.copyright laws and is <br /> subject to legal prosecution This document was electronicalty produced with permission of the AIA and can be reproduced without violarion until the date of expiration as <br /> noted below. <br /> Electronic Format B801/CMa-1992 <br /> User pocument: 6801 --4/9/2001.AIA License Number 120057, which expires on 10/31/2001 --Page#5 <br />