and they shall be paid for by the Owner as provided in this
<br /> 2.3.23 The Construction Manager shall arrange for the Agreement, in addition to the compensation for Basic
<br /> delivery, storage, protection and security of Services. The Optional Additional Services described under
<br /> � Owner-purchased materials, systems and equipment that are Paragraph 33 shall only be provided if authorized or
<br /> . a part of the Project until such items are incorporated into confirtned in writing by the Owner. If services described
<br /> the Project. under Contingent Additional Services in Paragraph 3.2 are
<br /> " required dne to circumstances beyond the Construction
<br /> 2.3.24 With the Architect and the Owner's maintenance Manager's control,the Construction Manager shall notify the
<br /> personnel, the Construction Manager shall observe the Owner prior to commencing such services. If the Owner
<br /> Contractors' final testing and start-up of utilities,operational deems that such services described under Paragraph 3.2 are
<br /> systems and equipment. not required, the Owner shall give prompt written notice to
<br /> the Construction Manager. If the Owmer icidicates in writing
<br /> 2.3.25 When the Construction Manager considers each that all or part of such Contingent Additional Services are
<br /> Contractor's Work or a designated portion thereof not required, the Construction Manager shall have no
<br /> substantially complete, the Construction Manager shall, obligatipn to provide those services.
<br /> jointly with the Cor�tractor,prepare for the Architect a list of
<br /> incomplete or unsatisfactory items and a schedule for their 3.2 CONTfNGENT ADDITIONAL SERVICES
<br /> completion. The Construction Manager shall assist the 3.2.1 Providing services required because of significant
<br /> Architect in conducting inspections to determine whether the changes in the Project including, but not limited to, changes
<br /> Work or designated portion thereof is substantially complete. �size,quality,complexity or the Owner's schedule.
<br /> 1.�.26 Tne Construciion Nlanager snall coordinate the 3.�.2 Provi�i�zg �,c�su��tiar. CVIIVVlt i:�g r�plac�::�: of
<br /> correction and completion of the Work. Following issuance Work damaged by fire or other cause during construction,
<br /> of a Certificate of Substantial Completion of the Work or a and fumishing services required in connection with the
<br /> designated nortion thereo� the Construction Manager shall replacement of such Work.
<br /> evaluate the completion of tAe Work of the Contractors and
<br /> make recommendations to the Architect when Work is ready 3.2.3 Providing services made necessa.ry by the
<br /> for final inspection. The Construction Manager shall assist termination or default of the Architect or a Contractor, by
<br /> , the Architect in conducting final inspections. major defects or deficiencies in the Work of a Contractor,or
<br /> by failure of performance of either the Owner or Contractor
<br /> 2.3.27 The Construction Manager shall secure and under a Contract for Construction,
<br /> transmit to the Architect warranties and similar submittals
<br /> required by the Contract Documents for delivery to the 3.2.4 Providing services in evaluating an extensive
<br /> Owner and deliver all keys, manuals, record drawings and number of claims submitted by a Contractor or others in
<br /> .__,... �,.,.v.. .,. +i.e n. 'r'1, �...,�+.:-L'C.::,,� ._O:tinxtinn yyi�h thP Wnr�i..
<br /> 111Q111LG11411C.�i JWbl�J �v ua�. V�11V1. 111V va.
<br /> Manager shall forward to the Architect a final Ptoject
<br /> Application for Payment upon compliance with the 3.2.5 Ptoviding services in connection with a public
<br /> requirements of the Contract Documents. hearing, arbitration proceeding or legal proceeding except
<br /> where the Construction Manager is party thereto.
<br /> 2.3.28 Duties, responsibilities and limitations of authority
<br /> of the Construction Manager as set forth in the Contract 3.3 OPTIONAL ADDITIONAL SERVICES
<br /> Documents shall not be restricted, modified or extended 3.3.1 Providing services relative to future facilities,
<br /> without written consent of the Owner, Construction systems and equipment.
<br /> Manager, Architect and Contractors. Consent shall not be
<br /> unreasonably withheld. 3,3.2 Providing services to investigate existing conditions
<br /> or facilities or to provide measured drawings thereof.
<br /> ARTICLE 3 3.3.3 Providing services to verify the accuracy of
<br /> ADDITIONAL SERVICES drawings or other information furnished by the Owner.
<br /> 3.1 GENERAL
<br /> _ 3.3,4 Providing services required for or in cor�nection
<br /> 3.1.1 The services described in this Article 3 are not with the Owner's selection, procurement or installation of
<br /> included in Basic Services uniess so identified in Article 14, furniture,furnishings and related equipment.
<br /> ' AIA DOCUMENT B801/CMa - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 EDITION - AIA - COPYRIGHT 1992 - THE t1MERICAN
<br /> INSTITiTTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.,20006-5292.Unlicensed photocopying violaYes U.S.copyright laws and is
<br /> subject to legal prosecution.This document was electronically produced with permission of the AIA and can be reproduced without violarion unrit the date of expiration as
<br /> noted below.
<br /> Electronic Format B841/CMa-1992
<br /> User pocumsn#: 6801 --4/9/2001. AIA License Number 120057, which expires on 10/31/�001 --Page#6
<br />
|