Laserfiche WebLink
, � • � Page 2 <br /> STAFF REFERENCE: <br /> Keith D. Alexander, Director of Water Management, 424-2863 <br /> BUDGET/TIME IMPLICATIONS: <br /> This project consists of two phases, paid for by the Water Capital Fund: <br /> Work Estimated Estimated Expenditure <br /> Done By Duration Cost Fiscal Year(s) <br /> Phase 1 BGM & 6 months $69,500 2001-02 <br /> Engineering Design Assoc. <br /> Phase 2 Contractor 12 months $2,000,000 2001-02 and <br /> Tank Construction (bid) 2002-03 <br /> Attach: 2 �, <br />