Laserfiche WebLink
FY-2001 CAPITAL PROGRAM <br /> - FEDERAL TRANSIT ADMINISTRATION - <br /> TOTAL FTA FUNDS AVAILABLE: $256,957 <br /> TOTAL FUNDS AVAILABLE: $321,197 <br /> ($256,957 FTA - $64,240 STATE OR LOCAL MATCH) <br /> COST � ITEM � � <br /> FTA - MATCH ' <br /> $165,913 MULTI-MODAL TRANSPORTATION FACILITY <br /> $132,730-$33,183 Construction of the buildin and develo ment of the facilit site. <br /> $40,000 SERVICE TRUCK <br /> $32,000-$8,000 5-Ton truck (approx.) able to tow buses, with crane, air compressor, front <br /> winch, " uick-start" unit, rear tow bum er and front ush bum er. <br /> RADIO SYSTEM <br /> $38,000 g00 Mhz trunked radio system linked to City's E911 dispatch system, <br /> $30,400- �7,60o including mobile radios with handsets for each revenue vehicle and each <br /> service truck, portable radios for each supervisor's vehicle, and 3 control <br /> stations. <br /> $8,000 MAINTENANCE EQUIPMENT <br /> $6,400- $1,600 Vehicle air conditionin service center. <br /> $15,000 FUELING STATION CANOPY <br /> $12,000- �3,000 40' long canopy over the fueling station, extending part way over the bus <br /> lane, with a wind-break wall on the western side. <br /> REPAIR/UPGRADE BUS WASHER <br /> $25,000 Replace washer brushes, replace valves with anti-hammer valves, add under <br /> $20,000- $5,000 washer unit and wheel washer, and add supplemental pump for wheel <br /> washer. <br /> $26,000 SIGNS & SHELTERS <br /> $20,800- $5,200 Purchase signs and posts to replace all bus stop signs, and purchase <br /> additional shelters and re lacement shelter sections. <br /> $3,284 SIDEWALK REPLACEMENT <br /> $2 62� $65� Remove plantings and replace sidewalk around front of Transit <br /> Administration Buildin . <br /> $321,197 TOTAL COST, ' <br /> $256,957-$64,24o FTA - MATCH <br /> \M ulti-Modal\ConstructionW ewFedFundsA.lwp <br />