My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 9:52:11 AM
Creation date
2/18/2016 9:51:52 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-15
Res Ord Title
AUTHORIZING PROFESSIONAL ENGINEERING SERVICES AGREEMENT TO CRAWFORD, MURPHY & TILLY, INC. FOR SOUTH WATER TREATMENT PLANT EAST CLARIFIERS CONVERSION PROJECT
Approved Date
2/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � ' <br /> c. Keep a diary or log book, recording the Contractor's hours on the job site,weather conditions, <br /> data relative to questions of Change Orders, or changed conditions, list of job site visitors, <br /> daily activities, decisions, observations in general, and specific observations in more detail,as <br /> in the case of observing test procedures and send copies to the City's Representative. <br /> d. Take multiple photographs of the Work and keep a log and file of the photos. The <br /> photographs shall be provided to the City's Representative upon demand and at project <br /> closeout. <br /> e. Record names, addresses and telephone numbers of all the Contractors, Subcontractors, and <br /> major suppliers of materials and equipment. <br /> 7. Reports• The Consulting Engineer shall, <br /> a. Furnish the City's Representative periodic reports, as required, on progress of the Work and <br /> of the Contractor's compliance with the progress schedule and schedule of Shop Drawings <br /> and sample submittals. <br /> b. Consult with the City's Representative, in advance of scheduled major tests, inspections, or <br /> start of important phases of the Work. <br /> c. Draft proposed Change Orders and obtaining back-up material from the Contractor, and make <br /> recommendations to the City's Representative regarding Change Orders and Field Orders. <br /> d. Report immediately to the City's Representative upon the occurrence of any accident. <br /> 8. Contract Interpretation; Review of Qualitv of Work. The Consulting Engineer shall: <br /> a. Issue all instructions of the City's Representative to the Contractor(s). <br /> b. Issue necessary interpretations and clarifications of the Contract Documents and in <br /> connection therewith prepare change orders as required, subject to the City's Representative's <br /> approval. <br /> c. Have authority, as a representative of the City,to require special inspection or testing of the <br /> work. <br /> d. Act as initial interpreter of the requirements of the Contract Documents and judge of the <br /> acceptability of the work there under and make decisions on all claims of the Contractor(s) <br /> relating to the acceptability of the work or the interpretation of the requirements of the <br /> Contract Documents pertaining to the execution and progress of the work. <br /> 9. Prepare En�ineer's Pay Estimate. The Consulting Engineer shall, based on the Consulting <br /> Engineer's on-site observations as an experienced and qualified design professional and on review <br /> of the Inspectors Daily Reports and Quantity Book, determine the amounts owing to the <br /> Contractor(s)and prepare an Engineer's Payment Estimate recommending the amount of <br /> payment far completed work. Such recommendations of payment shall constitute a representation <br /> to the City's Representative, based on such observations and review, that the work has progressed <br /> to the point indicated and that to the best of the Consulting Engineer's knowledge, information <br /> and belief,the quality of such work is in accordance with the Contract Documents(subject to an <br /> evaluation of such work as a functioning Project upon Substantial Completion,to the results of <br /> any subsequent tests called for in the Contract Documents, and to any qualifications stated in his <br /> recommendation), and that payment of the amount recommended is due the Contractor(s). The <br /> Engineer's Payment Estimate shall be prepared not less than monthly while construction is <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.