My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-15 PROFESSIONAL ENGINEERING SERVICES AGREEMENT SWTP CLARIFIERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 9:52:11 AM
Creation date
2/18/2016 9:51:52 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-15
Res Ord Title
AUTHORIZING PROFESSIONAL ENGINEERING SERVICES AGREEMENT TO CRAWFORD, MURPHY & TILLY, INC. FOR SOUTH WATER TREATMENT PLANT EAST CLARIFIERS CONVERSION PROJECT
Approved Date
2/16/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ` . <br /> proceeding. The pay estimate shall be prepared on a spreadsheet form supplied by the City's <br /> Representative at the beginning of this phase of work. <br /> 10. Determination of Substantial Completion. The Consulting Engineer shall conduct an inspection <br /> to determine if the Project is substantially complete and conduct a final inspection to determine if <br /> the work has been completed in accordance with the Contract Documents and if each Contractor <br /> has fulfilled all of his obligations there under so that the Consulting Engineer may recommend, in <br /> writing, final payment to each Contractor and may give written notice to the City's <br /> Representative and the Contractor(s)that the work is acceptable (subject to any conditions therein <br /> expressed). <br /> 11. Authority and Responsibilit� The Consulting Engineer shall not guarantee the work of any <br /> Contractor or Subcontractor, shall have no authority to stop work, shall have no supervision or <br /> control as to the work or persons doing the work, shall not have charge of the work, shall not be <br /> responsible for safety in, on, or about the job-site or have any control of the safety or adequacy of <br /> any equipment, building component, scaffolding, supports, forms or other work aids, and shall <br /> have no duties or responsibilities imposed by the Structural Work Act upon the "owner" under <br /> that Act and shall not be the "person in control of work" within the meaning of that Act. <br /> 12. Consulting En�ineer Not Responsible for Acts of Contractor. The Consulting Engineer shall not <br /> be responsible for the supervision or control of the acts or omissions or construction means, <br /> methods or techniques of any Contractor, or Subcontractor, or any of the Contractor(s)'or <br /> Subcontractors' agents or employees or any other person(except the Consulting Engineer's own <br /> employees and agents)at the site or otherwise performing any of the Contractor(s)'work; <br /> however, nothing contained in this contract shall be construed to release the Consulting Engineer <br /> from liability for failure to properly perform duties undertaken by him in these Contract <br /> Documents or this Agreement. <br /> 13. Preparation of Record Drawin�s. The Consulting Engineer shall prepare a set of record plans on <br /> which shall be noted all changes which may have occurred during construction. The record <br /> drawings need not detail changes in measurements, elevation lines or grades which are within the <br /> normally accepted construction tolerances. Record drawings may be prepared using AutoCAD or <br /> other electronic plan preparation method. Alternately, record drawings may be prepared using <br /> manual methods. The plans shall be delivered to the City's Representative in the form of one set <br /> of prints and electronic file if record drawings were prepared by electronic methods. The cost of <br /> document reproduction shall be considered to be a reimbursable expense and paid in accordance <br /> with Section V(C)of this agreement. <br /> 14. Completion Time. The Consulting Engineer shall complete the Construction Inspection Phase <br /> within the time period set forth in EXhibit C, Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements, flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.