Laserfiche WebLink
Page 2 <br /> Associated with the Agreement are the standard requirements by IDOT that the City approve, by <br /> ordinance, permanent motor vehicle parking restrictions within the project limits; prohibiting the <br />� release of waste water into storm sewers• and re latin encroachments into the ublic <br /> , � g P <br /> ri t-of-wa . <br /> � Y <br /> The first ordinance, which becomes Exhibit B to the Agreement, designates locations within the <br /> project limits where motor vehicle parking is prohibited. Parking is not currently allowed or <br /> provided within the project limits, this ordinance will formalize that. <br /> The second ordinance, which becomes Exhibit C to the Agreement, requires the City to regulate <br />' the discharge of sanitary sewage or industrial waste water such that it cannot be drained into any ' <br /> . storm sewers that are constructed as part of this project. <br />, The third ordinance, which becomes Exhibit D to the Agreement, requires the City to regulate , <br /> encroachments into the public right-of-way. Encroachments might include buildings, signs, , <br /> fences, sidewalks or other objects that may be positioned in the public right-of-way. IDOT did <br /> perform a field review and no encroachments were noted that required special attention. This <br /> ordinance is an administrative requirement of IDOT whether or not an encroachment actually ' <br /> exists. I <br /> POTENTIAL OBJECTION: There are no known objections. I <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation I <br /> STAFF REFERENCE: Matt Newell, City Engineer at 424-2747 <br /> BUDGET/TIME IMPLICATIONS: <br /> Design and construction costs relative to this proposed project will be borne by the City($6,654), <br /> State ($1,515,846) and Federal ($3,480,000) governments. The City's cost is for its portion of <br /> the traffic signal work proposed for U.S. Route 51 / lst Drive and Martin Luther King Jr. Drive/ <br /> Lake Shore Drive. The City's resolution (to become Exhibit A to the Agreement) allocates a <br /> maximum cost of$8,318, or 125% of the estimated construction cost. These costs will be paid <br /> with Motor Fuel Tax Funds. <br /> Attach: 5 <br />