Laserfiche WebLink
, � :� <br /> ADDITIONS AND��I$A�S <br /> CHAPTER 25. <br /> 3. (C) <br /> (2) to persons residing, or intending to reside, in a single <br /> family dwelling owned by such person or persons and who install, <br /> alter or service electrical equipment therein - provided that, said <br /> owner/occupant must submit to a minimum written test as <br /> prescribed by the Electrical Commission and ,pass said test with a <br /> satisfactor,�score of 70% and such person or persons must reside in <br /> said residence for not less than six (6) months after completion of <br /> such work, and that such work is subject to all other requirements <br /> of applicable Code or ordinance. <br /> CHAPTER 69. <br /> 10. B. (1) <br /> (c) Whenever a new service is installed, the electric meter <br /> shall be located on the outside of the building unless written <br /> approval from Illinois Power and the City �e-a� Inspection <br /> Division is obtained. <br /> 10. B. (2) <br /> (a) Whenever a new service is installed, the electric meter <br /> shall be located on the outside of the building unless written <br /> approval from Illinois Power and the City �sa� Inspection <br /> Division is obtained. <br /> 11. SERVICE CONNECTIONS. The utility company <br /> may connect the electrical service to the structure when the service <br />