Laserfiche WebLink
, . � ,. <br /> is installed permanently on the structure and upon order of the <br /> Inspection Division ���. Where services have been <br /> damaged due to weather conditions, a permit and inspection will be <br /> necessary only when new conductors are being installed. Such <br /> inspections will be of the electrical service only. <br /> During severe weather conditions the Building Inspection <br /> Supervisor may waive <br /> all pernuts and inspections. Under such conditions the repaired <br /> services must remain the same size and materials must be used <br /> accordingly. If a larger size service is requested by the owner, then <br /> a11 such provisions of this code shall apply. <br /> 12. INSPECTIONS. All electrical wiring installed under <br /> a permit issued as herein provided must be inspected before being <br /> concealed and must have a final approved inspection before the <br /> Certificate of Occupancy is eligible for issuance. It is the <br /> responsibility of the electrical contractor, or those making electrical <br /> installations or alterations, to give such timely notice requesting <br /> inspections. It may be necessary at various times to lengthen the <br /> time before inspections can be made and shall be at the discretion of <br /> the Building Inspection Supervisor. Failwe to call for final <br /> electrical inspections before structures are occupied or after job <br /> completion, will cause for the Inspection �e� Division to <br /> submit the case before the Electrical Commission for possible <br /> license suspension or revocation. The Inspection �epar-��� <br /> Division may revoke a permit or withhold approval of work in case <br /> there has been a false statement or representation as to a material <br /> fact in the application, the plans, or specifications upon which such <br /> approval of such permit was based. <br />� <br />