My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-221 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-221 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:34:46 AM
Creation date
3/29/2016 10:34:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-221
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES FOR LAKE DECATUR DREDGING DURING LOW WATER LEVEL FEASIBILITY STUDY
Approved Date
11/6/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• �� • v I <br /> 13. Contract Documents—Documents that establish the rights and obligations of the parties <br /> en a ed in construction and include the Construction A reement between OWNER and <br /> gg g <br /> Contractor,Addenda(which pertain to the Contract Documents),Contractor's Bid <br /> (including documentation accompanying the Bid and any post-Bid documentarion <br /> submitted prior to the notice of award)when attached as an e�ibit to the Construcrion <br /> Agreement,the notice to proceed,the bonds,appropriate certifications,the General <br /> Conditions,the Supplementary Conditions,the Specifications and the Drawings as the <br /> same are more specifically identified in the Construction Agreement,together with all <br /> Written Amendments,Change Orders,Work Change Direcrives,Field Orders,and <br /> ENGINEER's written interpretations and clarificarions issued on or after the Effective <br /> Date of the Construction Agreement. Approved Shop Drawings and the reports and <br /> drawings of subsurface and physical conditions are not Contract Documents. <br /> 14. Contract Price—The moneys payable by OWNER to Contractor for complerion of the <br /> Work in accordance with the Contract Documents and as stated in the Constxuction <br /> Agreement. <br /> 15. Contract Times—The numbers of days or the dates stated in the Construction Agreement <br /> to: (i)achieve Substanrial Complerion,and(ii)complete the Work so that it is ready for <br /> fmal payment as evidenced by ENGINEER's written recommendation of final payment. <br /> 16. Contractor—An individual or entity with whom OWNER enters into a Construction <br /> Agreement. <br /> 17. Correction Period—The time after Substanrial Complerion during which Contractor must <br /> correct,at no cost to OWNER,and Defective Work,normally one year after the date of <br /> Substantial Completion or such longer period of time as may be prescribed by Laws or <br /> Regularions or by the terms of any applicable special guarantee or specific provision of <br /> the Contract Documents. <br /> 18. Defective—An adjective which,when modifying the word Work,refers to Work that is <br /> unsatisfactory, faulty,or deficient,in that it does not conform to the Contract Documents, <br /> or does not meet the requirements of any inspection,reference standard,test,or approval <br /> referred to in the Contract Documents,or has been damaged prior to ENGINEER's <br /> recommendarion of fmal payment. <br /> 19. Documents—Data,reports,Drawings,Specificarions,Record Drawings,and other <br /> deliverables,whether in printed or electronic media format,provided or furnished in <br /> appropriate phases by ENGINEER to OWNER pursuant to this Agreement. <br /> 20. Drawings—That part of the Contract Documents prepared or approved by ENGINEER <br /> which graphically shows the scope,extend,and character of the Work to be performed by <br /> the Contractor. Shop Drawings are not Drawings as so defined. <br /> 21. Effective Date of the Construction Agreement—The date indicated in the Conshuction <br /> Agreement on which it becomes effective,but is no such date is indicated,it means the <br /> date on which the Construction Agreement is signed and delivered by the last of the two <br /> parties to sign and deliver. <br /> 22. Effective Date of the Agreement—The date indicated in this Agreement on which it <br /> becomes effective,but if no such date is indicated,it means the date on which the <br /> Agreement is signed and delivered by the last of the two parties to sign and deliver. <br /> 23. ENGINEER's Consultants—Individuals or entities having a contract with ENGINEER to <br /> furnish services with respect to this Project as ENGINEER's independent professional <br /> associates,consultants,subcontractors,or vendors. The term ENGINEER includes <br /> ENGINEER's Consultants. <br /> 24. Field Order—A written order issued by ENGINEER which directs minor changes in the <br /> Work but which does not involve a change in the Contract Price or the Contract Times. <br /> Standard Form of Agreement <br /> Between Owner and Engineer for Professional Services <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.