Laserfiche WebLink
• `S �i ' K <br /> 25. General Conditions—That part of the Contract Documents which sets forth terms, <br /> conditions and procedures that govem the Work to be performed or furnished by the <br /> Contractor with respect to the Project. <br /> 26. Hazardous Environmental Condition—The presence at the Site of Asbestos,PCB's, <br /> Petroleum,Hazardous Waste,or Radioactive Materials in such quanrities or <br /> circumstances that may present a substantial danger to persons or property exposed <br /> thereto in connection with the Work. <br /> 27. Hazardous Waste—The term Hazardous Waste shall have the meaning provided in <br /> Section 1004 of the Solid Waste Disposal Act(42 USC Section 6903)as amended from <br /> time to time. <br /> 28. Laws and Regulations;Laws or Regulations—Any and all applicable laws,rules, <br /> regulations,ordinances,codes,standards,and orders of any and all governmental bodies, <br /> agencies,authorities,and courts having jurisdicrion. <br /> 29. PCB's—Polychlorinated biphenyls. <br /> 30. Petroleum—Petroleum,including cnzde oil or any fraction thereof which is liquid at <br /> standard conditions of temperature and pressure(60 degrees Fahrenheit and 14.7 pound <br /> per square inch absolute),such as oil,petroleum,fuel oil,oil sludge,oil refuse,gasoline, <br /> kerosene,and oil mixed with other non-Hazardous Waste and crude oils. <br /> 31. Radioactive Materials—Source,special nuclear,or byproduct material as defined by the <br /> Atomic Energy Act of 1954(42 USC Secrion 2011 et seq.)as amended from time to <br /> time. <br /> 32. Record Drawings—'The Drawings as issued for construction on which ENGINEER,upon <br /> completion of the Work,has shown changes due to Addenda or Change Orders and other <br /> informarion which ENGINEER considers significant based on record documents <br /> furnished by Contractor to ENGINEER and which were annotated by Contractor to show <br /> changes made during construction. <br /> 33. Reimbursable Expenses—The expenses incurred d'uectly by ENGINEER in connecrion <br /> with the performing or furnishing of Basic and Additional Services for the Project for <br /> which OWNER shall pay ENGINEER as indicated in E�chibit C. <br /> 34. Resident Project Representative—The authorized representative of ENGINEER,if any, <br /> assigned to assist ENGINEER at the Site during the Construcrion Phase. The Resident <br /> Project Representarive will be ENGINEER's agent or employee and under ENGINEER's <br /> supervision. As used herein,the term Resident Project Representative includes any <br /> assistants of Resident Project Representative agreed to by OWNER. The duties and <br /> responsibilities of the Resident Project Representative are as set forth in Exhibit D. <br /> 35. Samples—Physical examples of materials,equipment or workmanship that are <br /> representative of some portion of the Work and which establish the standards by which <br /> such portion of the Work will be judged. <br /> 36. Shop Drawings—All drawings,diagrams,illustrations,schedules,and other data or <br /> information which are specifically prepared or assembled by or for Contractor and <br /> submitted by Contractor to ENGINEER to illustrate some portion of the Work. <br /> 37. Site—Lands or areas indicated in the Contract Documents as being furnished by OWNER <br /> upon which the Work is to be performed,rights-of-way and easements for access thereto, <br /> and such other lands furnished by OWNER,which are designated for use of Contractor. <br /> 38. Specifications—That part of the Contract Documents consisting of written technical <br /> descriptions of materials,equipment,systems,standards,and workmanship as applied to <br /> the Work and certain administration details applicable thereto. <br /> 39. Substantial Completion—The time at which the Work(or specified part thereo fl has <br /> progressed to the point where,in the opinion of ENGINEER,the Work(or a specified <br /> Standazd Form of Agreement <br /> Between Owner and Engineer for Professional Services <br /> 13 <br />