Laserfiche WebLink
Pedestrian Underpass Feasibiliry Study June 17, 1997 <br /> East Marietta Street and East Condit Street <br /> Alternate 2 <br /> T�nd�ass �tn�ct�re Marietta Street - Open Cut Method <br /> See Exhibit C for pIan and profile of pedestrian underpass. <br /> Two methods could be used to construct an underpass. Alternate 2 is "open cut" <br /> construction of a concrete box cuiver[ type of structure. This method will require <br /> coordination with the Illinois Central and "windows of construction time" will be required I <br /> to perform some of the work. Lighting would be installed by placin� the conduit in the I, <br /> wall pours and installing wall mount light fixtures. Ramps would be constructed from the <br /> box cuIvert, in accordance with Americans with Disabilities Act (ADA) requirements, until <br /> they reach existing ground elevation_ Ramp and culvert width would allow bicycle traffic. <br /> The open cut method of construction will require excavation under the railroad. Due to <br /> the proximity of railroad turnouts, the use of a temporary railroad alignment is not <br /> feasible. Therefore, temporary bridge structures, as shown in Exhibit D, would be <br /> installed to provide an area for the open cut construction. The raiiroad has indicated that <br /> the west track, lmown as the Amtrak Connectior� can be out of service for twenty-four to <br /> forty-eight hours. The center track is the railroad's main track and can be out of service <br /> for no more than four hours at a time, unless special arrangements are made. The east <br /> track is the interchange track and it may be out of service no more than eight hours at a <br /> time. <br /> A temporary structure would be placed at each track location_ These temporary bridges <br /> will be constructed by the railroad company. Agreements between the railroad company <br /> and the unions require that bridge and building personnel construct any bridge that will be <br /> constructed on an active track. Temporary bridges of this type are used in many locations <br /> where rail traffic must be maintained on the existing alignment. Actual methods and <br /> scheduling would be established in the design phase of the project and are not detailed in <br /> this report. Construction of the bridges will require coordination with the railroad to <br /> remove and replace their track during the phased work. <br /> A.fter construction of the box culvert the area would be backfilled, the bridges removed <br /> and the raikoad placed back in service. Construction would continue on the ramps until <br /> the project is completed. <br /> The design criteria of the Illinois Central Railroad, as shown in Exhibit B, will govern this <br /> construction method. The temporary bridges and the new concrete box culvert will be <br /> designed for E-80 loading as required in the American Railway En�ineering Association's <br /> - Manual for Ra.ilway Engineering. <br /> WVP Corporation � Page - 4 <br />