Laserfiche WebLink
Pedestrian Underpass Feasibility Study June 17, 1997 <br /> East Marietta Street and East Condit Street <br /> dlternate 3 <br /> Underp�ss Structur� Marietta Street - Concrete Pipe Construction. <br /> Alternate 3 will be installation of 12 foot inside diameter rei.nforced concrete pipe by the <br /> mining and jacking method. The installation of the concrete pipe, as shown in Exhibit E, <br /> will minimize any interruption to train service. A floor would be poured in the pipe to <br /> provide a walkway and lighting would be installed by mounting conduit and light fixtures <br /> on the curved wall of the pipe. <br /> Construction of the ramps and drainage would be similar to that noted in Alternate 2. <br /> Blternate 4 <br /> Over�ass Structure. Marietta Street <br /> As shown in E�ibit F, a pedestrian overpass would consist of a bridge set on two <br /> abutments and include stairs and ramps to ga.in access to the bridge. The ramps would <br /> meet ADA criteria but would not meet width requirements for bicycle access. The ramps <br /> would be constructed in a spiral effect to gain elevation to the bridge. As noted, the <br /> bottom of the bridge will be 23 feet above top of rail. The bridge could be constructed in <br /> a normal steel beam a.nd concrete deck method, as shown in E�ibit G, or a prefabricated <br /> structure that would be set in place, as shown in Exhibit H. Securifiy fencing wouid be <br /> placed on the bridge and sides of the ramps. Lighting would also be placed on the bridge. <br /> dlternate 5 <br /> Modification to L7nderpass Stn.icture Condit Street <br /> According to plans furnished by the City of Decatur, the Condit Street underpass was <br /> constructed around 1936. The underpass, shown in Exhibit I, extends from just east of <br /> Clinton Street to just west of Calhoun Street. The existing subway has five foot sidewalks , <br /> on both sides and a pavement width� face to face of curb, of 30 feet. At the present time I <br /> the underpass has a marked vertical clearance of 13 feet 9 inches, thus restricting truck <br /> traffic. The street has been resurfaced in recent years. The existing roadway surface has <br /> an approximate profile grade of seven percent between the vertical curve at the bottom of <br /> the underpass and the vertical curve at the crest at both ends of the underpass area. <br /> Considering the length of time the underpass has been in service the retaining walls, <br /> sidewalk and pavement surface appear to be in good condition. During a field survey of <br /> the site it was noted that the walls east of the railroad bridge have a very slight lean <br /> toward the roadway. West of the bridge, and on the north wall, it appears that a portion <br /> of the retaining wall has been repa.ired near the pumping station_ A portion of the <br /> . WVP Corporation " " " Page - 5 <br />