, Pedestrian Underpass Feasibility Study June 17, 1997 <br /> East Marietta Street and East Condit Street <br /> water seepage should be investigated and repaired thus preventing ice buildup in the <br /> winter. Additional overhead lighting couId be installed on both the south and north side of <br /> the underpass to provide better night-time visibility. Fencing, or retaining wall, could be <br /> erected along both railroad right-of-way lines to prevent pedestrians from crossing the <br /> railroad above the underpass. <br /> Alternate 5$ <br /> Sidewalk Modification to Underpass Structure Condit �treet ' <br /> As shown in Exhibit J, the sidewalk on the south side would be raised above the street to a <br /> lesser grade on the surface of the walk. The grade would be under 5 percent, thus <br /> allowing the elimination of landings every thirty feet. As shown, a concrete barrier will be <br /> constructed and new sidewalk will be placed behind the wall. The height of the wall will <br /> vary from nine inch curb at the top of the underpass to about three feet six inches at the <br /> low point. The sidewalk will follow along the top of the barrier. <br /> Installation of the concrete barrier will reduce the pavement width from 30.2 feet to 29. 3 <br /> feet, still above mrn;t„um requirements for width. A four-foot high chainlink fence would <br /> be placed on top of the wall to provide pedestrian protection. <br /> Lighting requirements, fencing of the railroad right of way and sealing of water seepage as <br /> noted in Alternate SA would apply to Altemate SB. <br /> This alternate will provide ADA accessibility but will not meet requirements for bicycle <br /> use due to width. <br /> �iternate SC <br /> Street �nd Sidewalk Modification to Underpass Stn�ct,�re Condit Street <br /> As shown in Exhibit J, modifications can be made to the sidewalk to have it comply with <br /> ADA criteria and provide width for bicycle use. In this alternate the sidewalk on the <br /> south side of Condit Street is increased to ten feet in width and the sidewalk on the north <br /> side is eliminated. The centeriine of the roadway would be moved north and would be <br /> transitioned outside of the underpass limits. A concrete barrier would be placed along the <br /> north retaining wall to prevent vehicles from hitting the retaining wall and transitioned into <br /> the existing curb at both ends of the underpass. <br /> Moving the centerline of the roadway will require removal and replacement of the existing <br /> bituminous overlay. In addition, as noted in Alternate SB, drainage structures will be <br /> modified or relocated. The sidewalk on the north side would be ternunated away from the <br /> WYP Corporation Paae ' � <br />