Laserfiche WebLink
* <br /> OF'�EC <br /> � ��9� <br /> C <br /> v�'�r�T a <br /> ��� <br /> `�:I:i9 <br /> �" '/[L I N O�S� <br /> September 25, 2000 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> No. 2000-15 <br /> Memorandum To: Honorable Mayor and City Council <br /> From: Steve Garman, City Manager � <br /> Stephen Swanson, Acting Director of Engineering & Infrastructure� <br /> Richard Berard, Civil Engineer II �� <br /> Subject: Lake Decatur Dam Repairs <br /> Right Embankment <br /> City Project 2000-28 <br /> The inspection of the Lake Decatur Dam by Harza identified that parts of the dam are in <br /> need of repairs andlor rehabilitation. This need is generally the result of maintenance <br /> requirements to preserve the integrity and functionality of the structure. The nature of the repairs <br /> consists mainly in the maintenance or replacement of elements for erosion protection on the right <br /> embankment of the dam. <br /> The Engineering Division prepared the plans and specifications for the project. <br /> Bids were received and opened on September 21, 2000. The results (copy of the bid tabulation <br /> is attached) of the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over ,-Underl <br /> Engineer's Estimate $ 53,980.00 ------ <br /> Entlers Excavating Co., Inc. $ 72,050.00 33.48 <br /> Halverson Construction Co., Inc. $ 72,690.00 34.66 <br /> Christy-Foltz, Inc. $106,365.00 97.05 <br />