My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-162 AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-162 AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 9:48:05 AM
Creation date
3/30/2016 9:48:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-162
Res Ord Title
AUTHORIZING A CONTRACT FOR A TRANSIT PLANNING STUDY - THE CORRADINO GROUP
Approved Date
9/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5: Internal Operations Analysis <br /> Corradino will meet with the staff of the Decatur Public Transit System to identify internal <br /> operational issues and concerns, such as method of sale of tickets, tokens and passes; <br /> maintenance and administrative costs; and revenue potential. These will be documented in a <br /> matrix format and examined with appropriate recommendations identified. <br /> Task 6: Service Area and Operations Recommendations <br /> Based on the work conducted in the study, Corradino will identify an appropriate service area for <br /> the transit system's fixed-route services; specific routes that should be maintained, deleted or <br /> added to the system; the number, size and type of vehicles that should be operated to provide <br /> these services; service frequencies, spans and days of service; and fare structure. <br /> These recommendations will be incorporated into tables that illustrate costs, potential ridership, <br /> hours and miles of service, etc. In addition, a graphic route map will be prepared presenting the <br /> proposed fixed-route transit system. <br /> Task 7: Optimum Transit System <br /> The transit system service recommendations defined in Task 6 will be reviewed with the City <br /> and in light of the established financial and political limitations of the Decatur Public Transit <br /> System. Based on these constraints the recommended services will be refined into an optimum <br /> system that will be presented in draft form as the recommended optimum fixed-route transit <br /> system. <br /> Reports— <br /> Conadino will produce and deliver to the City five (5) copies of each draft Technical <br /> Memorandum. It will produce and deliver five (5) copies of the draft Final Report. And it will <br /> produce and deliver ten(10) copies of the Final Report. <br /> Decatur Public Transit System <br /> Transit Planning Study 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.