My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-93 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-93 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 4:34:44 PM
Creation date
3/30/2016 4:34:43 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-93
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION
Approved Date
6/19/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . <br /> , . Page 2 <br /> The reconstruction process involves removing the existing pavement, constructing a <br /> soil-cement base and placing a new asphalt concrete surface. The finished surface of the new <br /> pavement is approximately 4 inches below its original grade for curbed streets. The finished <br /> surface for non-curbed streets will vary from 0 to 4 inches above the existing street surface. The <br /> reconstruction process does inconvenience residents and disrupt local traffic. This work is <br /> ; essentially building a new street and the street must be closed to all traffic for up to a week to ten <br /> , days. Residents will be inconvenienced and not have direct access to their driveways while the <br /> '', street is closed. Staff will be working with the contractar to keep residents and emergency <br /> services informed of the project's progress and to make arrangements for residents having special <br /> I needs. The closures will be held to a minimum, but will be unavoidable. It is expected that <br /> �I complaints from affected residents will occur. <br /> The project specifications were prepared by the Engineering Division. The project was . <br /> advertised and bids were received and opened on June 12, 2000. The results of the letting are as <br /> , follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 1,580,930.00 --- <br /> '�� Dunn Company $ 1,563,762.50 (1.09) <br /> The receipt of one bid is a concern to staff as it relates to the City obtaining competitive <br /> bids. However, in this instance the receipt of one bid is considered acceptable given the historic <br /> �, number of contractars that have bid on City street reconstruction projects and the need to proceed <br /> � with this project for the general benefit of the public. Dunn Company has done this work for the <br /> , last three years to the satisfaction of staff and residents. <br /> Funding for this project will be from the City's General Capital Improvements Fund. <br /> , It is recommended by staff that the City Council approve the attached resolution awarding <br /> � the contract for the Street Reconstruction Project, City Project 2000-24, to Dunn Company, at its <br /> �� low bid of$1,563,762.50 and that the Mayor be authorized to execute the contract. <br /> City staff will be available to answer questions that the Council may have at the meeting. <br /> �I attach: 3 <br /> cc: Phillip Wilhelm, Municipal Services Manager <br /> William Ratekin, Asst City Engineer <br /> Bob Dunn, Dunn Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.