My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-77 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-77 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 9:37:43 AM
Creation date
3/31/2016 9:37:40 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-77
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT SOUTH WATER TREATMENT PLANT RAW WATER PUMP STATION - SCADA SYSTEM
Approved Date
6/5/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Decatur South Water Treatment Plant/Raw Water Pump Station SCADA System <br /> PC & E Quote#0017-5, March 22, 2000 <br /> ' Drawings in AutoCAD format. A electronic version of the drawing and a Veilum <br /> will be provided. <br /> ' Drawings: # of sheets: <br /> System Architecture 1 <br /> PLC enclosure 1 <br /> ' Terminal block drawings 2 <br /> I/0 drawings 3 <br /> Schematics 1 <br /> , PLC control power 1 <br /> Control field wiring 2 <br /> SWTP PLC drawing 1 <br /> � SWTP I/O drawings 2 <br /> SWTP control power 1 <br /> Bubbler panel schematic 1 <br /> ' A complete construction package will be provided to the City of Decatur. <br /> This will include a detailed scope of work and construction specifications in CSI <br /> ' format. This pacakage will have all the necessary technical information required <br /> to allow contractors to bid the installation. <br /> ' Project manuals (3) — Project manuals will contain Sequence of Operation, VO i <br /> list, PLC ladder logic, recommended spare parts list, purchased equipment <br /> specifications and purchased equipment operations and maintenance manuals. <br /> , Fee Schedule: <br /> ' This work will be done on a Lump Sum basis for the amount of$ 28,900. If <br /> additional work is required, PC & E will submit a change order request stating the <br /> reason for the change, the dollar cost of the change and the effect that the <br /> , change will have on the schedule. Invoicing will be on a monthly basis based on <br /> a percent complete of the work to be performed. <br /> ' Acceptance of Conditions: <br /> No exceptions to the proposal are taken. No employees of PC & E are spouses <br /> or children or have children who are Decatur City employees. <br /> ' Qualifications: <br /> PC & E Inc. has worked on several similar projects in the recent past. These <br /> ' include: <br /> Testing of the existing spread spectrum radio system for the City of Decatur. <br /> ' This project is complete and was completed under the estimated amount. Karl <br /> Pezzelle was the project engineer. <br /> � Water Treatment Plant Controls upgrade for the City of Rantoul. This project is <br /> described on the enclosed "Water Experience — Control Systems". Construction <br /> of this two phase (East & West plants) project is complete. The project lasted <br /> , <br /> , Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.