Laserfiche WebLink
. ti <br /> Project....... ...........................Park Place Curb&Gutter Removal/Replacement [iNGINEER'S ESTIMATE Otto Baum Company,Inc. Entler Excavating Co.,[nc. Christy Foltz,Inc. <br /> City Project...........................9959 . PO Box 3488 819 N.Sunnyside Road 740 South Main Street <br /> ('ity Engineering Drvision Decatur,Illinois 62524 Decatur,Illinois 62522 Decatur,Illinois 62521 � <br /> Bid Date.................................Thursday,May 25,2000 <br /> Time........................................ 130 p.m. 5%BID BOND 5%B[D BOND 5%BID BOND <br /> Apparent Low Bidder <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> NUMBER PRICE PRICE PRICE PRICE <br /> � <br /> 1 COMBINATIONCURB&GUTTERREMOVAL LF 1,770 $4.05 $7,168.50 $9.60 $16,992.00 $11.00 $19,470.00 $3.00 $5,310.00 <br /> 2 COMBINATION CURB&GUTTER TYPE B-6:18 LF ],770 $32.40 $57,348.00 $16.30 $28,851.00 $19.80 $35,046.00 $29.00 $51,330.00 <br /> 3 PAVING BRICK REMOVAL&RE-INSTALLATION LUMP SUM 1 $2,020.00 $2,020.00 $2,500.00 $2,500.00 $750.00 $750.00 $500.00 $500.00 <br /> TOTAL BID As Corrected $66 536.50 $4S 343.00 S55 266.00 $57 140.00 � <br /> Percent Over or nder ENGINEER'S ESTIMATE 27.34 16.94 1412 <br /> The Apparent Low Bi tto Baum <br /> �`��"`� <br /> tephen Sw son,P.E.,City Engineer Date <br />