|
Project............................Jasper Street/Southeast Sewer ENGINEER'S ESTIMATE Coastal Gunite Construction Parkway Conshuction&Assoc ACfolder,Inc. En-Tech Cocp. InsituCortn Technologies,Inc.
<br /> Ciry ProlecL....................9955 l6 Washing[on S[reet 1000 Civic Circle 17988 Fdison Avenue 75 Oak S[reet 12897 Main S[ree[
<br /> City EnAineerinQ Division PO Box 977 Department NG Chesterfield,Missouri 63005 Suite 20l PO Box 456
<br /> Bid Date.........................Febntary l0,2000 Cambridge,Maryland 21613 Lewisville,Texas 75067 Norwood,New Jersey 07648 Lemont,Illinois 60439
<br /> Time................................2:00 p.m. 5%BID BOND 5%BID BOND 5%BID BOND 5%BID BOND 5%BID BOND
<br /> Apparen[Low Bidder
<br /> ITEM PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> NUMBER PHASE 2(GUNITE SHOTCRETE) PRICE PRICE PRICE PRICE PRICE PRICE
<br /> l GUNITE/SHOTCRETE36-TNCH LF 1,084 $82.50 $89,430.00 $87.00 $94,308.00 $ll8.50 $128,454.00 $160.00 $U3,440.00 $200.00 5216,800.00 N/A $0.00
<br /> 2 GUN11'E/SHOTCRETE50-INCH LF 380 $128.00 $48,640.00 �120.00 545,600.00 $14735 $55,993.00 $220.00 $83,600.00 $222.00 $84,360.00 N/A $0.00
<br /> 3 GUNITE/SHOTCREI'E54-INCH LF 815 5157.00 $127,955.00 $130.00 5105,950.00 $152J0 $124,450.50 $165.00 $134,475.00 $240.00 $195,600.00 N/A $0.00
<br /> 4 GUNITE/SHOTCRETE60-INCH LF 1,490 E187.50 5279,375.00 $I44.00 $214,560.00 $168.85 $251,586.50 5190.00 5283,100.00 $267.00 $397,830.00 N/A $0.00
<br /> 5 GCJNITE/SHOTCRETE72-INCH •LF 730 $242.00 $176,660.00 $172.00 $125,560.00 5202.00 $147,460.00 $200.00 $146,000.00 $300.00 $219,000.00 N/A $0.00
<br /> 5 TRAFFIC CONTROL&PR07'ECTION SUM 1 $3,000.00 $3,000.00 $20,000.00 $20,000.00 $7,500.00 $7,500.00 $4,500.00 $4,500.00 $10,000.00 $10,000.00 N/A $0.00
<br /> 6 FNE YEAR MAINTENANCE BOND SUM I $25,000.00 $25,000.00 $4,500.00 $4,500.00 $7,760.00 $7,760.00 $3,700.00 $3,700.00 $I2,000.00 512,000.00 N/A $0.00
<br /> TOTAL BID(AS CORRECTED) $750,060.00 $610,478.00 $723,204.00 $828,815.00 $1,135,590.00 $0.00
<br /> Percent Over or(Under)ENGINEER'S EST[MATE (18.61 (3.58 10.50 51.40
<br /> (100.00
<br /> The Apparent Low Bidder'� astal Gunite Construction Co.
<br /> �- i�1--a'�,
<br /> tephen Sw nson,P.E.,City Engineer Date
<br />
|