My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-35 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-35 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:11:36 PM
Creation date
4/6/2016 2:11:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-35
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT JASPER STREET / SOUTHEAST SEWER REHABILITATION CITY PROJECT 9955
Approved Date
3/20/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project............................Jasper Street/Southeast Sewer ENGINEER'S ESTIMATE Coastal Gunite Construction Parkway Cons[mction&Assoc Allolder,Inc. En-Tech Corp. Insi[uCortn Technologies,Inc. <br /> City Prol�t.....................9955 16 Washington Stree[ 1000 Civic Circle 17988 Edison Avenue 75 Oak Street 12897 Main Street <br /> City EnRineerinQ Division PO Box 977 Department NG Chesterfeld,Missouri 63005 Suite 201 PO Box 458 <br /> Bid Date.........................February 10,2000 Cambridge,Maryland 216t3 Lewisville,Texas 75067 Norwood,New 7ersey 07648 Lemon[,Illinois 60439 <br /> Time................................2:00 p.m. 5%BID BOND 5%BID BOND S%BID BOND 5%BID BOND 5%BID BOND <br /> Apparent Low Bidder . <br /> ITEM PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL LJNIT TOTAL UNIT TOTAL �� <br /> NUMBER PHASE 2(CURED IN PLACE) PRICE PRICE PRICE PffiCE PRICE PRICE ��. <br /> 1 GUNITE/SHOTCRETE36-INCH LF 1,084 $140.00 $151,760.00 N/A $0.00 N/A $0.00 N/A $0.00 N/A $0.00 $145.00 $157,180.00 �I <br /> 2 GLINITE/SHOTCRETE50-INCH LF 380 $150.50 $57,190.00 N/A $0.00 N/A $0.00 N/A $0.00 N/A $0.00 $340.00 $129,200.00 I <br /> 3 GtJNI1'E/SHOTCRE7'E54-INCH LF 815 $165.00 $134,475.00 N/A 50.00 N/A $0.00 N/A $0.00 N/A $0.00 $322.00 $262,430.00 <br /> 4 Gi.JNITE/SHOTCRETE 60-INCH LF t,490 $210.00 $312,900.00 N/A $0.00 N/A $0.00 N/A $0.00 N/A $0.00 $406.00 $604,940.00 <br /> 5 GCJNITE/SHOTCRETE 72-[NCH LF 730 $310.00 $226,300.00 N/A 50.00 N/A $0.00 N/A $0.00 N/A $0.00 $590.00 $430,700.00 �I <br /> 5 7'RAFFIC CONTROL&PROTECTION SUM t $3,000.00 $3,000.00 N/A $0.00 N/A $0.00 N/A $0.00 N/A $0.00$10,500.00 $10,500.00 II <br /> 6 FIVEYEARMAINTENANCEBOND SUM I 510,000.00 $10,000.00 N/A $0.00 N/A $0.00 N/A $0.00 N/A $0.00$23,700.00 $23,700.00 �I <br /> TOTAL BID(AS CORRECTED) $895,625.00 $0.00 $0.00 $0.00 $0.00 $1,618,650.00 I <br /> Percent Over or nder ENGINEER'S ESTIMATE 100.00 100.00 100.00 100.00 80.73 ' <br /> The Apparent Low Bidder is: stal Gunite Construction Co. �. <br /> �� -t g--�o '' <br /> Ste hen S anson,P.E.,City Engineer Da[e ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.