My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-20 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-20 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 2:44:08 PM
Creation date
4/6/2016 2:44:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-20
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 21ST STREET SEWER SEPARATION DRAINAGE AREA 4 CITY PROJECT 9828
Approved Date
3/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� oF'Dfc <br /> =' C <br /> V 70 <br /> � <br /> `Z':I:i� <br /> '/[lINO�`'� <br /> February 29, 2000 ', <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 2000-08 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garm ity Manager <br /> Bruce A. Mc b, P.E.,Director of Public Works <br /> �jStephen Swans n, P.E., City Engineer <br /> y�Kris Quandt, I.T., Civil Engineer I <br /> SUBJECT: 21st Street Sewer Separation Drainage Area 4 <br /> City Project 9828 <br /> The neighborhood generally bounded by 19th Street on the west, Lawrence Street on the <br /> north, 22nd Street on the east and Cantrell Street on the south (refer to attached locale map), <br /> experiences considerable drainage problems during heavy rainstorms. The City contracted with <br /> the consulting firm of Bainbridge, Gee, Milanski & Associates, Inc. (BGM), in 1988, to design <br /> the improvements to mitigate the drainage problems in this area. BGM completed the design <br /> project, but the City did not pursue the construction of the improvements in 1988, because of <br /> budgetary reasons. <br /> The decision to proceed with the drainage improvements, at this time, was the result of <br /> the streets in the area needing to be reconstructed. City staff did not want to make the street <br /> improvements knowing that major drainage improvements were also needed. For this reason, it <br /> was decided to defer the street improvements until the drainage improvements were completed. <br /> The City contracted with BGM in 1999,to update the plans for the drainage improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.