|
James A.Slowikowski
<br /> Field Coordinator Phone: (217) 244-3820
<br /> Illinois Sta[e Water Survey E-Mail:slow@uiuc.edu
<br /> Education
<br /> University of Idaho
<br /> 1979,B.S.,in Wildlife Biology
<br /> Professional Experiences
<br /> 1989-1995, 1998-Present
<br /> Illinois State Water Survey,Champaign IL
<br /> Field Coordinator with the duties to oversee and conduct the field data collection efforts for applied research
<br /> projects within the Watershed Science Section. Provide technical oversight and training for field technicians ,
<br /> involved with assigned projects. Assist in the development of a comprehensive QA/QC protocol for data collection
<br /> efforts within the section.
<br /> 1996-98
<br /> HydroScience Water Resource Consultants,Rantoul IL
<br /> Director of Field Opera[ions with responsibility for coordinating and conducting all field activities and personnel
<br /> working in the field.Represented the company in bid solicitations,sales and contract negotiations.Provided
<br /> technical oversight on bid proposals and was responsible for oversight of the costing on most bids.
<br /> Publica6ons
<br /> Contract Reports
<br /> Lin,S.D.,R.K.Raman,W.C.Bogner,J.A.Slowikowski,G.S.Roadcap,and D.L.Huilinger. 1996.Diagnostic-
<br /> Feasibiliry Study of Wolf Lake, Cook County,Illinois and Lake County, Indiana. Contract Report to City of
<br /> Hammond,Indiana;Illinois Environmental Protection Agency;and Indiana Department of Natural Resources.
<br /> Raman R.K.,S.D.Lin,D.L.Hullinger,W.C.Bogner,J.A.Slowikowski,and G.S.Roadcap. 1996.Diagnostic-
<br /> Feasibility Study of Lake George,Lake County,Indiana. Contract Report to City of Hammond,Indiana.
<br /> Schmidt,A.R.and J.A.Slowikowski. 1996.Rating for Acoustic Velocity Meter in Turbines I &2 at Lockport
<br /> Power Plant, Lockport IL Contract Report to Metropolitan Water Reclamation District,Chicago,II..
<br /> Sloat J.V.,A.R.Schmidt,and J.A.Slowikowski. 1996. Ultrasonic Velocity Meter Calibration Measurements in the
<br /> South Florida Water Management District Everglade Nutrient Removal Site,Lo�hatachee, FL.Contract
<br /> Report to the South Florida Water Management District,West Palm Beach,Florida.
<br /> Schmidt,A.R.,J.A.Slowikowski,and S.R.Tarte. 1995.Discharges Measured in the Mississippi River,Pool Seven,
<br /> Near the Dakota Navigation lmprovement.Contract RepoR to Army Corp of Engineers,Minneapolis-St.Paul,
<br /> Minnesota.
<br /> Schmidt,A.R.,J.A.Slowikowski,and S.R.Tarte. 1995. Velocity Profiles Measured Near Lock&Dams 20-25 in the
<br /> Upper Mississippi.Contract Report to Army Corp of Engineers,St Louis,Missouri.
<br /> Slowikowski,J.A.,W.C.Bogner,and N.G.Bhowmik. 1993.An Evaluation of Streambank Stabilization Work on
<br /> Richland Creek. Contract Report to Illinois Department of Energy and Natural Resources. -
<br /> Bhowmik N.G.,W.C.Bogner,and J.A.Slowikowski. 1991.Source Monitoring and Evaluation of Sediment Inputs
<br /> for Lake Peoria. Contract Report to Illinois Department of Energy and Natural Resources.
<br /> Technical Presentation
<br /> Slowikowski,J.A.,W.C.Bogner,and N.G.Bhowmik. 1993.An Evaluation of Streambank Stabilization Work on
<br /> Richland Creek. 24th Annual Conference of the International Erosion Control Association,Indianapo(is,
<br /> Indiana.
<br />
|