My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-160 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-160 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 2:14:30 PM
Creation date
4/7/2016 2:14:17 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-160
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CDBG SIDEWALK CURB RAMPS FOR ADA CITY PROJECT 9927
Approved Date
9/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY PROJECT 9927 <br /> Sidewalk Curb Ramps for ADA <br /> ENGINEER'S Karnic <br /> Bid Date August 26, 1999 ESTIMATE Construction Bodine Services, Inc. Christy-Foltz, Inc. <br /> Engineering 1089 W. Marietta 5330 E. Firehouse Road Decatur, IL <br /> Division Decatur, IL 62522 Decatur,IL 62521 62521 <br /> Time: 1:30 p.m. <br /> PAY ITEM UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRIC� TOTAL UNIT PRICE TOTAL <br /> Aggregate Base Course,CA6 TON 20 $25.00 $500.00 $20.00 $400.00 $50.00 $1,000.00 $50.00 $1,000.00 <br /> Portland Cement Concrete SF 10230 $4.75 $48,592.50 $1.95 $19,948.50 $4.00 $40,920.00 $6.20 $63,426.00 <br /> Sidewalk 5-Inch <br /> Sawcutting LF 715 $2.65 $1,894.75 $2.25 $1,608.75 $3.00 $2,145.00 $2.00 $1,430.00 <br /> Concrete Sidewalk Removal SF 8,540 $1.50 $12,810.00 $0.80 $6,832.00 $1.25 $10,675.00 $1.50 $12,810.00 <br /> Pavement Removal Bituminous SY 73.6 $1.50 $110.40 $6.00 $441.60 $7.50 $552.00 $10.00 $736.00 <br /> Concrete <br /> Combination Concrete Curb& LF 832 $35.00 $29,120.00 $17.65 $14,684.80 $27.00 $22,464.00 $42.00 $34,944.00 <br /> Gutter Removal and Replacement <br /> Pavement Patching Bituminous SY 73.6 $6.50 $478.40 $25.00 $1,840.00 $30.00 $2,208.00 $80.00 $5,888.00 <br /> Concrete 2-Inch <br /> Work Zone Safety Control EA 22 $125.00 $2,750.00 $100.00 $2,200.00 $150.00 $3,300.00 $150.00 $3,300.00 <br /> TOTAL BID(AS CORRECTED) $96,256.05 $47,955.65 $83,264.00 $123,534.00 <br /> PERCENT OVER OR(UNDER) <br /> ENGINEERING ESTIMATE -0.5017908 -0.134974 0.28338946 <br /> Rounded <br /> The Apparent Low Bidder is: Karnic Construct' nc. <br /> y- !¢-��i <br /> Stephen P.Swanson Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.