Laserfiche WebLink
+ CITY PROJECT 9851 <br /> � 21ST/LOCUST STREET <br /> ' INTERSECTION <br /> � <br /> ENGINEER'S Entler Excavating Otto Baum <br /> Bid Date August 30, 1999 ESTIMATE Co., Inc. Company, Inc. <br /> Engineering 819 N. Sunnyside 1788 Hubbard Ave. <br /> Division Decatur, IL 62522 Decatur, IL 62526 <br /> Time: 10:00 a.m. <br /> PAY ITEM UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> TRENCH BACKFILL CU YD 20 $17.00 $340.00 $30.00 $600.00 $17.92 $358.40 <br /> SUB-BASE GRANULAR SQ YD 1,186 $6.15 $7,293.90 $6.00 $7,116.00 $3.64 $4,317.04 <br /> MATERIAL, TYPE B 4" <br /> BITUMINOUS MATERIALS GAL 131 $1.50 $196.50 $2.00 $262.00 $2.02 $264.62 I <br /> (PRIME COAT) <br /> LEVELING BINDER (MACHINE TON 40 $50.00 $2,000.00 $100.00 $4,000.00 $103.04 $4,121.60 I <br /> METHOD) MIXTURE C, TYPE 2 <br /> BITUMINOUS CONCRETE <br /> SURFACE COURSE, MIXTURE C, TON 185 $55.00 $10,175.00 $70.00 $12,950.00 $69.44 $12,846.40 ' <br /> CLASS 1, TYPE 2 , <br /> BITUMINOUS CONCRETE I <br /> SURFACE COURSE, MIXTURE D, TON 225 $55.00 $12,375.00 $72.50 $16,312.50 $72.24 $16,254.00 <br /> CLASS 1, TYPE 2 <br /> PORTLAND CEMENT <br /> CONCRETE PAVEMENT, 10" SQ YD 1,120 $55.00 $61,600.00 $38.50 $43,120.00 $42.45 $47,544.00 <br /> (JOINTED) <br /> PAVEMENT FABRIC SQ YD 1,120 $7.50 $8,400.00 $5.00 $5,600.00 $3.64 $4,076.80 <br />