Laserfiche WebLink
. _ ` � <br /> ' CITY PROJECT 9851 <br /> 21 ST/LOCUST STREET <br /> INTERSECTION <br /> r <br /> ENGINEER'S Entler Excavating Otto Baum <br /> Bid Date August 30, 1999 ESTIMATE Co., Inc. Company, Inc. <br /> Engineering 819 N. Sunnyside 1788 Hubbard Ave. <br /> Division Decatur, IL 62522 Decatur, IL 62526 <br /> Time: 10:00 a.m. � <br /> PAY ITEM UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL I <br /> COMBINATION CONCRETE <br /> CURB AND GUTTER, TYPE M-6. FOOT 95 $17.50 $1,662.50 $14.90 $1,415.50 $19.60 $1,862.00 <br /> 18 (ABUTTING EXISTING <br /> PAVEMENT) <br /> COMBINATION CONCRETE <br /> CURB AND GUTTER, TYPE M-6. FOOT 81 $17.50 $1,417.50 $15.90 $1,287.90 $19.32 $1,564.92 <br /> 18 <br /> TRAFFIC CONTROL AND <br /> PROTECTION, STANDARD LS 1 $2,500.00 $2,500.00 $5,500.00 $5,500.00 $6,160.00 $6,160.00 <br /> 701501 <br /> TRAFFIC CONTTROL AND LS 1 $3,000.00 $3,000.00 $5,500.00 $5,500.00 $3,920.00 $3,920.00 <br /> PROTECTION STANDARD 701701 <br /> CONCRETE FOUNDATION, TYPE FOOT 7 $120.00 $840.00 $450.00 $3,150.00 $560.00 $3,920.00 <br /> A <br /> TOTAL BID (AS CORRECTED) $152,338.90 $151,581.95 $159,052.84 <br /> PERCENT OVER OR (UNDER) <br /> ENGINEERING ESTIMATE -0.0049689 0.04407239 <br /> Rounded -0.5% 4.41% <br /> The Apparent Low Bidder is: Entler Excavating Co., Inc. <br /> L � i5 i�-� `l'` G �-'�9' <br /> Matthew C. Newell Date <br />