My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-144 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-144 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 2:46:07 PM
Creation date
4/7/2016 2:46:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-144
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT TRAFFIC SIGNAL IMPROVEMENTS CITY PROJECT 9909
Approved Date
9/7/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY PROJECT 9909 <br /> TRAFFIC SIGNAL IMPROVEMENTS <br /> ENGINEER'S ESTIMATE Bodine Electric of Decatur Egizii Electric,Inc. J.F.Edwards Construction Co. � <br /> Bid Date....................August 17, 1999 1845 N.22nd Street 700 N.MacArthur Blvd. 220 S.Chicago St. <br /> City Engineering Division Decatur,IL 62526 Springfield,IL 62702 Geneseo,IL 61254 <br /> Time...............................10:15 a.m. ' <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> SERVICE INSTALLATION,TYPE B EA 4 $806.88 $3,227.52 $905.04 $3,620.16 $561.00 $2,244.00 $577.94 $2,311.76 <br /> TRENCH AND BACKFILL FOR � 22gg $2.�6 $4,963.68 $1.73 $3,975.54 $1.91 $4,389.18 $3.49 $8,020.02 <br /> ELECTRICAL WORK <br /> RELOCATE EXISTING TRAFFIC SIGNAL � 3 $625.74 $1,877.22 $537.84 $1,613.52 $839.30 $2,517.90 $1,227.00 $3,681.00 <br /> CONTROLLER <br /> REMOVE EXISTING TRAFFIC SIGNAL � 5 $2,093.79 $10,468.95 $2,021.76 $10,108.80 $2,055.90 $10,279.50 $3,735.00 $18,675.00 <br /> EQUIPMENT <br /> PAINTTRAFFIC SIGNAL EQUIPMENT LS 1 $1,243.00 $1,243.00 $1,037.88 $1,037.88 $1,347.50 $1,347.50 $3,715.00 $3,715.00 <br /> (MAIN AND CHURCH) <br /> TOTAL BID AS CORRECTED $334 149.26 $325,681.73 $334,924.87 $479,299.57 <br /> Percent Over or-Under ENGINEER'S ESTIMATE -2.53% 0.23% 43.44% <br /> The Apparent Low Bidder is: Bodine Electric of Decatur <br /> ���'�-�`��.�� �-� 5��� <br /> Matthew C.Newell Date <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.