My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-131 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-131 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 3:10:51 PM
Creation date
4/7/2016 3:10:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-131
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT MILLING AND REHABILITATION CITY PROJECT 9908
Approved Date
8/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF'°fc <br /> �� 9� <br /> G <br /> v �� a <br /> �_� <br /> �iti�� <br /> '/[L I N O�`'� <br /> August 10, 1999 ' <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 99 - 46 �'� <br /> MEMORANDUM TO: Honorable Mayor and City Council ! <br /> FROM: James L. Williams,Jr., City Manager �i <br /> Bruce A. McNabb, P. E., Director of Public Works ' <br /> Stephen P. Swanson, P. E., City Engineer ;o�,� � <br /> SUBJECT: Milling And Rehabilitation <br /> City Project 9908 <br /> The City's annual programs for contracted street conventional resurfacing and the contracted <br /> milling and rehabilitation are combined into one project. This was done for the first time last <br /> year on a trial basis to determine the impact on City staffls time and what cost savings could be <br /> achieved by having a larger project. It was found that some savings was realized on asphalt <br /> prices and the decision was made to continue the practice of combining the two projects into a <br /> single project. Savings in staff time was largely in the area of contract administration and was <br /> the result of having only one contract to manage'along with a corresponding savings associated <br /> with paperwork. <br /> The conventional resurfacing involves overlaying an existing street surface with a layer of <br /> hot bituminous concrete. The milling and rehabilitation involves removing one to three inches of <br /> the existing street surface by milling and then placing a new hot bituminous concrete surface <br /> over the milled area. The purpose of these programs is to restore the useful life to a pavement in <br /> advance of its deteriorating to a condition that would require its complete reconstruction. An <br /> additional benefit of the program is that the rideability of the street is improved for users. This , <br /> year's program will include approximately 13.5 centerline miles of streets throughout the City. A <br /> listing of the streets in this year's program is attached. <br /> This year's project also includes overlay work for Macon County that is being done through <br /> a cooperative arrangement between the City and County. This work is paid for by Macon County <br /> using its MFT funds and is similar to the arrangement between the City and County for the past <br /> several years. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.