Laserfiche WebLink
CO1��II�UNITY DEVELOPMENT MEMORANDUM <br /> NO. 99- 117 <br /> May 19 , 1999 <br /> TO: 7ames Williams, Jr., City Manager <br /> FROM: Cecil Collins, Jr., Director of Community Development <br /> William B. Turner, Building Inspections Supervisor <br /> SUBJECT: Generator for Mass Transit <br /> In preparing for the Year 2000, several items that could ca.use some major problems came to <br /> light. At the present time, there is no way to pump fuel from the underground tanks. raise the <br /> overhead doors of the maintenance facility or provide heat and lighting if the electrical power was <br /> disrupted. <br /> It is proposed to purchase a 20 KV diesel-fueled generator set. The 20 KV unit will not provide <br /> power to the facility to operate at 100% efficiency but will provide adequate power for an <br /> emergency situation. <br /> It is suggested the generator set be skid or trailer mounted to facilitate moving the set to the most <br /> critical area of use. <br /> I received a su estion from one of the vendors contacted that we urchase the enerator set <br /> 88 P g <br /> directly from the manufacturer and then contact with a local vendor to do the installation. He felt <br /> this would be considerably less expensive. <br /> Attached are the specifications of the generator set for the Mass Transit Facility. <br />