My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-119 ACCEPTING AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-119 ACCEPTING AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 4:15:19 PM
Creation date
4/7/2016 4:15:19 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-119
Res Ord Title
ACCEPTING AND AUTHORIZING THE EXECUTION OF AN AGREEMENT BETWEEN THE CITY OF DECATUR AND STRAND ASSOCIATES, INC. FOR PROFESSIONAL SERVICES
Approved Date
8/2/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' Mr. Stephen P. Swanson <br /> City of Decatur <br /> Page 3 <br /> July 27, 1999 <br /> k. This step includes identifying the approximate location area for a water storage <br /> facility, if needed, and the general system needs for it to function. <br /> l. ADM interim and permanent demands. <br /> 7. Prepare a draft report summarizing results of the study with recommendations and <br /> estimates of probable construction cost. <br /> 8. Meet with City staff to review draft report and obtain comments. <br /> 9. Finalize report and provide 50 final copies plus one unbound copy. <br /> 10. Project scope includes one additional working meeting in Decatur. The timing and topic <br /> of this meeting will be determined during the course of the study. <br /> Service Elements Not Included <br /> The following services are not included under the scope of this Agreement. If such services are <br /> required of the ENGINEER, they shall be provided by an amendment to the Agreement or <br /> through a separate Agreement with the OWNER. <br /> 1. Original Distribution Model Creation. The PROJECT fees do not include the cost of <br /> creating the distribution model from existing "paper" maps. Use of an existing <br /> distribution model in a useable electronic format shall be provided by the OWNER. <br /> (Future reinforcements and facility improvements shall,however,be added to the model <br /> by the ENGINEER.) <br /> 2. Pipe Roughness Tests. The PROJECT fees do not include the cost of performing"pipe <br /> roughness" or C-Factor tests in the field. <br /> 3. Design or Construction Services. The PROJECT fees do not include any detailed facility <br /> design or construction services. These services could include preliminary layouts, <br /> archaeolo ical or wetland investi ations flood studies,hazardous contamination reviews, <br /> g g � <br /> or detailed sitin investi ations. <br /> g g <br /> 4. Additional Services: <br /> a. Additional work outside of the project scope. <br /> b. Services and/or expense above denoted allowance accounts. <br /> c. Prolongation of the contract time <br /> STRAND <br /> ASSOCIATES. INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.