My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:28:48 PM
Creation date
4/8/2016 2:28:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-73
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR NITRATE TREATMENT COST STUDY CITY PROJECT 9852
Approved Date
5/3/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 400. Develop Operating Cost Data. <br /> Probable annual operating costs will be developed for each of the treatment processes for the <br /> capacity and operating conditions specified in the Owner's Project Objective and General Scope of <br /> Work and listed under Task 200 above. Projected annual operating and maintenance costs will <br /> inciude chemicals, costs for periodic replacement of ion exchange resin and membranes, costs for <br /> expanded operating and maintenance labor requirements, fixed costs (costs that would be incurred <br /> whether the facilities are operating or not), disposal of wastewater / wash water, and energy <br /> requirements. <br /> Task 500. Draft Report <br /> The Engineer will summarize the results of the study in a draft report. The report will summarize all <br /> cost data in a present worth/life cycle format, and will present the information using graphs and <br /> tables accompanied with explanatory text. In addition to a comparison of probable costs, a <br /> summary of advantages and disadvantages of each nitrate removal alternative with respect to ease <br /> of implementation, utilization of proven technology, and impact on other water quality parameters <br /> will be presented. Recommendations regarding the need for any additional studies, such as pilot- <br /> scale testing will be included. A projected schedule for design, startup, and initial operation of the <br /> full-scale treatment facilities wifl also be included. Five copies of the draft report will be submitted <br /> to the Owner for review. <br /> Task 600. Final Report <br /> Upon receipt and incorporation of the Owner's comments, the Engineer will finalize the report and <br /> deliver 10 copies to the Owner. <br /> SUPPLEMENTAL SERVICES <br /> Any additional services requested by the Owner that are not included in the items listed above will <br /> be classified as supplemental services. The Engineer will provide a cost to provide these services <br /> if requested by the Owner. <br /> END OF ATTACHMENT A <br /> A-2 <br /> SLW 16:071 <br /> 04/20199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.