My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:28:48 PM
Creation date
4/8/2016 2:28:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-73
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR NITRATE TREATMENT COST STUDY CITY PROJECT 9852
Approved Date
5/3/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Obiective and <br /> General Scope of Work <br /> I. Proiect Obiective <br /> The City of Decatur water supply experiences periodic elevated nitrate levels above <br /> the 10 mg/I primary drinking water standard. The major source of the nitrate <br /> contamination is runot�' from a mainly agricultural watershed into Lake Decatur, <br /> the source water supply for the City. The City is under a Letter of Commitment <br /> (LOC) with the Illinois Environmental Protection Agency to be in compliance with <br /> the drinking water standard by April 15, 2001. As a solution to the nitrate <br /> problem, the City is considering using a low-nitrate natural source of water for <br /> blending. However, this source of water may not prove to be viable for blending <br /> pending the results of further studies. <br /> Therefore, the City may have to install nitrate treatment in the South Water <br /> Treatment Plant in the form of ion exchange (IX) or reverse osmosis (RO) as a <br /> method of compliance with the 10 mg/1 drinking water standard, and the City <br /> wants to determine the various associated costs and advantages/disadvantages to <br /> the two treatment methods. Ezisting reports available for use in this study are: <br /> Water Resources/Storage/Production Study, <br /> Haria Engineering, August 1996 ' <br /> Feasibility Study of Lake Decatur Watershed 1�Ianagement Alternatives I <br /> for Nitrates, Environmental Planning and Economics, Inc., July 1997 '� <br /> Addendum No. 1 to the Feasibility Study, <br /> Black& Veatch and Environmental Planning and Economics, Inc. June 1998, <br /> Revised August and September 1998 <br /> City of Decatur Reverse Osmosis Treatment Facility, <br /> Strand Associates Inc.Brian Hackman, November 1998 <br /> Safe Drinking Water Act Compliance Study, <br /> Black& Veatch, January 1999 <br /> The following are assumptions that will be used for the study: <br /> ■ A total treated flow rate of 24 mgd (million gallons daily) from the water <br /> treatment plant. <br /> • A mazimum of 12 mg/1 (first assumption) and 16 mg/1 (second assumption) <br /> of nitrate in the source (lake)water. <br /> • A maximum of 9 mg/1 nitrate after treatment in finished (drinking) water. <br /> • Use of the IX for blending during times of nitrates > 9.5 mg/1 for a period of <br /> 90 days. <br /> • Use of RO for blending both during times of high nitrates and during at least <br /> 6 months of the year for TOC, THM-HAA, and taste and ador(T & O) control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.