My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-73 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:28:48 PM
Creation date
4/8/2016 2:28:47 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-73
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR NITRATE TREATMENT COST STUDY CITY PROJECT 9852
Approved Date
5/3/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2: Project Objective and <br /> General Scope of Work (continued) <br /> II. General Sco�e of Work <br /> The study will determine and detail the following areas: <br /> A. Capital Costs <br /> B. Design Costs <br /> C. Operating Costs, total (including: retentate disposal costs) <br /> 1. 30 days <br /> 2.. 90 days <br /> 3. 180 days <br /> D. Percent increase in total cost per million gallans water treated, <br /> O & M costs, and projected cost increase to water consumers. <br /> E. Chemical and electrical operating costs. <br /> F. Replacement resin (IX) or element (RO) costs. <br /> G. Fiaed Costs <br /> H. Present worth <br /> I. Advantages/Disadvantages to each method <br /> J. Estimated time table for design including pilot studies (if needed), <br /> permitting, start-up, training, and full operational use. <br /> III. Timeframe for the study is 30 - 45 days from notice to proceed to delivery of a <br /> written report. The use of high-cost paper and eatensive color in charts/graphs in <br /> the report is not required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.