Laserfiche WebLink
Page 2: Project Objective and <br /> General Scope of Work (continued) <br /> II. General Sco�e of Work <br /> The study will determine and detail the following areas: <br /> A. Capital Costs <br /> B. Design Costs <br /> C. Operating Costs, total (including: retentate disposal costs) <br /> 1. 30 days <br /> 2.. 90 days <br /> 3. 180 days <br /> D. Percent increase in total cost per million gallans water treated, <br /> O & M costs, and projected cost increase to water consumers. <br /> E. Chemical and electrical operating costs. <br /> F. Replacement resin (IX) or element (RO) costs. <br /> G. Fiaed Costs <br /> H. Present worth <br /> I. Advantages/Disadvantages to each method <br /> J. Estimated time table for design including pilot studies (if needed), <br /> permitting, start-up, training, and full operational use. <br /> III. Timeframe for the study is 30 - 45 days from notice to proceed to delivery of a <br /> written report. The use of high-cost paper and eatensive color in charts/graphs in <br /> the report is not required. <br />