Laserfiche WebLink
' � " ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK BWC #98-61(1) <br /> AND ASSOCIATES, INC. October21, 1998 <br /> � ,, , ,�� Page 4 of 6 ■■ <br /> ( �. ,. ;., ■■ <br /> Albany / Fulton Storm Drainage Improvements <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> D. PROJECT PLAN — PHASE II —Construction Documents and Bidding Assistance <br /> (Subject to the Direction of the City of Decatur) <br /> 5. PRODUCT— DETAILS SHEETS (2) <br /> ACTIVITIES: <br /> 5.1 Prepare and draft detail sheets. <br /> 5.2 Check, back check, and correct. <br /> 6. PRODUCT—QUANTITY CALCULATIONS <br /> ACTIVITIES: <br /> 6.1 Prepare list of quantities. <br /> 6.2 Prepare quantity take off sheets. <br /> 6.3 Check, back check, and correct. <br /> 7. PRODUCT—CONSTRUCTION COST ESTIMATE <br /> ACTIVITIES: <br /> 7.1 Prepare unit prices. <br /> 7.2 Pre are cost es i a e <br /> p tm t . <br /> 8. PRODUCT— EASEMENT DOCUMENTS2 <br /> ACTIVITIES: <br /> 8.1 Prepare list of affected properties. <br /> 8.2 Obtain last owner of record. <br /> 8.3 Request title search from Owner. <br /> 8.4 Compute easement boundaries. <br /> 8.5 Prepare easement descriptions. <br /> 8.6 Prepare permanent and temporary plats. <br /> 8.7 Check, back check, and correct. <br /> 8.8 Submit to Owner for review. <br /> 8.9 Revise per Owner comments. <br /> 8.10 Submit final documents to Owner. <br /> 2 Number of easements based on storm sewer routing in 1966 Report. Number may vary. <br /> Ten(10)easements assumed. <br />