Laserfiche WebLink
' ` ' ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK B�NC #98-61(1) <br /> � AND ASSOCIATES, INC. October21, 1998 <br /> _ ,; , , , Page 3 of 6 �� <br /> � „ f1 = F . . ■■ <br /> Aibany / Fulton Storm Drainage improvements <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> D. PROJECT PLAN — PHASE II —Construction Documents and Bidding Assistance <br /> (Subject to the Direction of the City of Decatur) <br /> 1. PRODUCT— FIELD NOTES <br /> ACTIVITIES: <br /> 1.1 Locate existing property pins in area. <br /> 1.2 Set survey control along selected corridor. <br /> 1.3 Pick up topographic features. <br /> 1.4 Run centerline profile. <br /> 1.5 Reduce notes. <br /> 2. PRODUCT— HYDROLOGY AND HYDRAULIC CALCULATIONS <br /> ACTIVITIES: <br /> 2.1 Finalize preliminary runoff calculations from Phase I. <br /> 2.2 Perform hydraulic storm sewer calculations. <br /> 2.3 Check, back check, and correct. <br /> 3. PRODUCT— PLAN AND PROFILE SHEETS (4 Each) <br /> ACTIVITIES: <br /> 3.1 Plot existing topographic features. <br /> 3.2 Plot and draft existing utility information. <br /> 3.3 Plot and draft existing property lines and right-of-way. <br /> 3.4 Field check existing features. <br /> 3.5 Plot and draft proposed storm sewer. <br /> 3.6 Plot and draft proposed manholes and inlets. <br /> 3.7 Check, back check, and correct. <br /> 4. PRODUCT—COVER SHEET <br /> ACTIVITIES: <br /> 4.1 Plot and draft cover sheet. <br /> 4.2 Check, back check, and correct. <br />