Laserfiche WebLink
' ' ' ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK B�NC #98-61(1) <br /> � AND ASSOCIATES, INC. October21, 1998 <br /> ;. i: �. Fi � � , � Page 2 of 6 ■ ■ <br /> � . , Id = F � ■■ <br /> Albany / Fuiton Storm Drainage Improvements <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> C. PROJECT PLAN — PHASE I — Preliminary Planning <br /> 1. PRODUCT— FIELD NOTES <br /> ACTIVITIES: <br /> 1.1 Perform site reconnaissance. <br /> 1.2 Outline drainage areas. <br /> 1.3 Perform preliminary field survey. <br /> 2. PRODUCT— DATA COLLECTION <br /> ACTIVITIES: <br /> 2.1 Obtain existing utility information. <br /> 2.2 Obtain existing and proposed subdivision plans. <br /> 3. PRODUCT— DRAINAGE CALCULATIONS <br /> ACTIVITIES: <br /> 3.1 Identify storm water discharge points. <br /> 3.2 Prepare prefiminary runoff calculations , <br /> 3.3 Sketch altemate storm sewer routings. '� <br /> 3.4 Prepare preliminary storm sewer calcutations. <br /> 4. PRODUCT—COST ESTIMATING <br /> ACTIVITIES: <br /> 4.1 Prepare preliminary cost estimates for altemate layouts. <br /> 5. PRODUCT—PHASE I REPORT <br /> ACTIVITIES: <br /> 5.1 Prepare Report of Phase I findings. <br /> 5.2 Transmit to Owner for review. <br /> 5.3 Meet with Owner to review Report. <br />