My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-165 ACCEPTING AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-165 ACCEPTING AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 11:52:52 AM
Creation date
4/11/2016 11:52:51 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-165
Res Ord Title
ACCEPTING AND AUTHORIZING THE EXECUTION OF AN AGREEMENT BETWEEN THE CITY OF DECATUR AND BLANK, WESSELINK, COOK & ASSOCIATES, INC. FOR PROFESSIONAL SERVICES
Approved Date
12/7/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' ' ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK B�NC #98-61(1) <br /> � AND ASSOCIATES, INC. October21, 1998 <br /> ;. i: �. Fi � � , � Page 2 of 6 ■ ■ <br /> � . , Id = F � ■■ <br /> Albany / Fuiton Storm Drainage Improvements <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> C. PROJECT PLAN — PHASE I — Preliminary Planning <br /> 1. PRODUCT— FIELD NOTES <br /> ACTIVITIES: <br /> 1.1 Perform site reconnaissance. <br /> 1.2 Outline drainage areas. <br /> 1.3 Perform preliminary field survey. <br /> 2. PRODUCT— DATA COLLECTION <br /> ACTIVITIES: <br /> 2.1 Obtain existing utility information. <br /> 2.2 Obtain existing and proposed subdivision plans. <br /> 3. PRODUCT— DRAINAGE CALCULATIONS <br /> ACTIVITIES: <br /> 3.1 Identify storm water discharge points. <br /> 3.2 Prepare prefiminary runoff calculations , <br /> 3.3 Sketch altemate storm sewer routings. '� <br /> 3.4 Prepare preliminary storm sewer calcutations. <br /> 4. PRODUCT—COST ESTIMATING <br /> ACTIVITIES: <br /> 4.1 Prepare preliminary cost estimates for altemate layouts. <br /> 5. PRODUCT—PHASE I REPORT <br /> ACTIVITIES: <br /> 5.1 Prepare Report of Phase I findings. <br /> 5.2 Transmit to Owner for review. <br /> 5.3 Meet with Owner to review Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.