Laserfiche WebLink
' � ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK BWC #98-61(1) <br /> AND ASSOCIATES, INC. October21, 1998 <br /> �., , � Page 1 of 6 �� <br /> � . . �I ' ■■ <br /> Albany / Fulton Storm Drainage improvements <br /> PROJECT REQUIREMENTS <br /> A. PROJECT DESCRIPTION: <br /> This is a storm drainage project to provide relief from poor drainage conditions and <br /> occasional flooding in the southeastem parts of Decatur. The specific area is generally <br /> bounded by Fulton Avenue on the North, Orchard Drive on the South, Montrose Street on <br /> the East, and 34th Street on the West. <br /> This project is proposed to be completed in three phases' as follows: <br /> Phase I: Preliminary Planning, Site Investigation, Data Collection and Report. <br /> Phase II: Preparation of Contract Documents, including Right-of-Way and <br /> Easement Documents for Construction, and Bidding Assistance. <br /> Phase III: Services During Construction. <br /> B. DISTRIBUTION OF RESPONSIBILITIES AMONG PROJECT PARTICIPANTS: � <br /> 1. BLANK. WESSELINK. COOK &ASSOCIATES, INC. (BWC): <br /> a. Civil Engineering. <br /> b. Technician/Drafting. <br /> c. Resident Project Representation and Inspection. <br /> d. Surveying. <br /> e. Administrative. <br /> 2. CITY OF DECATUR: <br /> a. Designate representative for contact. <br /> b. Provide access to project site. <br /> c. Provide avaifable utility information. <br /> d. Property title search. <br /> e. Easement negotiations. <br /> 3. OTHERS: <br /> a. Soils Investigation. <br /> � Description of Phases II and III revised 10/28/98 to agree with BWC Proposal Letter dated 10/28/98). <br />