My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-135 ACCEPTING AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-135 ACCEPTING AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 3:29:53 PM
Creation date
4/11/2016 3:29:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-135
Res Ord Title
ACCEPTING AND AUTHORIZING THE EXECUTION OF A CONTRACT BETWEEN THE CITY OF DECATUR AND CLARK DIETZ, INC. FOR THE CITY OF DECATUR STORM WATER PLAN UPDATE CITY PROJECT 9635
Approved Date
10/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• e f ATTACHMENT A <br /> . <br /> Funding sources will also be reviewed to identify methods that are currently being used to pay <br /> for different components of a stormwater program, including watershed planning, capital <br /> improvements,maintenance, development review and regulation, water quality management, and <br /> other elements. <br /> Work Tasks <br /> 7.1 Obtain copies of current ordinances, city codes,policy manuals, etc. that impact <br /> stormwater management. <br /> 7.2 Identify potential weakness, gaps, or modifications needed to improve stormwater <br /> management in the City. <br /> 7.3 Prepare a list of current funding levels for stormwater. <br /> 7.4 Identify criteria for evaluation of existing and potential stormwater financing <br /> mechanisms. <br /> 7.5 Prepare a draft chapter on Ordinance and Funding Review for inclusion in the interim <br /> Stormwater Master Plan Report. <br /> Deliverables <br /> • Draft Report Chapter on Ordinances and Funding Review II <br /> 8.0 Early Action Projects <br /> Overview <br /> It is anticipated that after brief review to develop a basic understanding of the improvements that <br /> have been proposed in the previous report(s) and to assure that these improvements are <br /> compatible with the overall master planning program, several of these projects can be <br /> recommended for early action. It will be important that a basic level of drainage improvements, <br /> compatible with available existing funding, continue to move forward. <br /> Work Tasks <br /> 8.1 Review information assembled in work elements 1.0 through 5.0 and identify lists of <br /> potential accelerated maintenance or capital improvement projects (up to six projects). <br /> 8.2 Update project concepts and preliminary layouts for the above identified projects. <br /> 8.3 Update the opinion of probable cost for the above identified projects. <br /> 8.4 Prepare a draft Early Action Project report chapter. <br /> A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.