My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-135 ACCEPTING AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-135 ACCEPTING AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 3:29:53 PM
Creation date
4/11/2016 3:29:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-135
Res Ord Title
ACCEPTING AND AUTHORIZING THE EXECUTION OF A CONTRACT BETWEEN THE CITY OF DECATUR AND CLARK DIETZ, INC. FOR THE CITY OF DECATUR STORM WATER PLAN UPDATE CITY PROJECT 9635
Approved Date
10/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
► ' ' � <br /> r <br /> ���, Fc7 <br /> a <br /> G <br /> Y 7e <br /> '�(LINO�S <br /> October 19, 1998 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 98-75 <br /> MEMORANDUM TO: Honorable Mayor and City Council ' <br /> FROM: James L.Williams, Jr., City Manager <br /> Bruce A. McNabb,Director of Public Works <br /> Stephen P. Swanson, P.E., City Engineer <br /> SUBJECT: City of Decatur Storm Water Plan Update <br /> City Project 9635 <br /> In 1965, the City of Decatur contracted with Warren& Van Pra�g, Inc. (WPI) to prepare <br /> a storm draina�e report for the City and its adjacent areas. WPI conducted investigations of the <br /> condition and capacities of the City's existing combined and separate storm sewer systems. This <br /> information and hydrologic analyses were used to develop master plan recommendations for new <br /> storm water improvements. The purpose of these improvements was to provide adequate <br /> drainage for undeveloped, partially developed and fully developed areas within and adjacent to the <br /> City's corporate limits. WPI's work involved the acquisition and development of a considerable <br /> amount of data and information. The result of WPI's work was the "Report on Storm Drainage <br /> for City of Decatur, Illinois" dated June, 1966. <br /> The 1966 report has and continues to serve as a useful resource to staff for evaluating <br /> storm water improvement problems and needs. However, the growth and changes that the City <br /> has experienced over the 30 years since the report was issued necessitates that the report be <br /> updated. The data, information and recommendations in the report have become outdated in <br /> many instances. Many factors used in preparin� the original recommendations have changed in <br /> the last 30 years. These factors include improvements the City has constructed; changing storm <br /> water management criteria, standards and practices; changing storm water quality and <br /> management regulations; and changing construction technology, equipment and costs. <br /> The update to the City's storm water master plan is important at this time for three basic <br /> reasons. The City's use of the plan for guidance and decision making relies greatly on the <br /> accuracy of the plan's data and information. Making decisions based on the interpretation and <br /> application of a 30 year old planning document may result in misdirecting the City's resources to <br /> cost effectively develop its storm water system to meet the City's present and future needs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.